Deck 2: Project, program, and Portfolio Selection

Full screen (f)
exit full mode
Question
According to Dr.Robert Kaplan and Dr.David Norton,a balanced scorecard rejects most traditional financial measures.
Use Space or
up arrow
down arrow
to flip the card.
Question
When using the hierarchical four-stage planning process for selecting projects,you must start at the bottom of the pyramid.
Question
Low- or medium-priority projects that can be finished in less time than high-priority projects should always be completed first.
Question
Organizations need to narrow down the list of potential projects to those projects that will be most beneficial.
Question
Projects with higher NPVs are preferred to projects with lower NPVs if all other factors are equal.
Question
Payback occurs in the year when the cumulative benefits minus costs reach zero.
Question
Money earned today is worth more than money earned in the future,primarily due to inflation.
Question
Some core projects can be high risk,have high value,and require good timing.
Question
In practice,organizations usually use a single approach to select projects.
Question
If you assign weights to criteria based on percentage,the sum of all the criteria's weights must total 100 percent.
Question
Organizations should only pursue projects that have the best financial value.
Question
The main goal of programs is to obtain benefits and control not available from managing projects separately.
Question
Organizations-both large and small-cannot undertake most of the potential projects identified because of resource limitations and other constraints.
Question
A weighted scoring model is a tool that provides a systematic process for selecting projects based on many criteria.
Question
Most crucial projects,such as drug development or major transportation projects,will achieve payback in less than a year.
Question
An organization should consider only projects with a negative NPV if financial value is a key criterion for project selection.
Question
From the viewpoint of NPV only,if Project 2 has a higher NPV than Project 1,Project 1 should be chosen.
Question
The required rate of return is the minimum acceptable rate of return on an investment.
Question
With respect to NPV,all organizations start discounting in Year 0 (immediately).
Question
Just as projects are unique,so are project portfolios.
Question
Given discounted benefits of $516,000 and discounted costs of $243,200,your ROI is ____ %.

A) 10
B) 89
C) 112
D) 212
Question
After assigning weights for the criteria and scores for each project,you calculate a weighted score for each project by multiplying the weight for each criterion by its score and ____ the resulting values.

A) multiplying
B) adding
C) dividing
D) subtracting
Question
The SWOT analysis looks at ____.

A) Services, Weaknesses, Opportunities and Threats
B) Strengths, Weaknesses, Objectives and Threats
C) Strengths, Weaknesses, Opportunities and Threads
D) Strengths, Weaknesses, Opportunities and Threats
Question
According to the ____ value of money,a dollar today is worth more than a dollar tomorrow.

A) financial
B) time
C) economic
D) discretionary
Question
Three primary methods for determining the projected financial value of projects include net present value analysis,return on investment,and ____ analysis.

A) growth
B) payback
C) environmental impact
D) efficiency
Question
Project managers must be sure to check with their organization to find out its guidelines for when discounting starts,what discount rate to use,and what ____ the organization prefers.

A) charts
B) technique
C) format
D) results
Question
Which of the following formulas is used by Excel to calculate NPV?

A) =npv()
B) =npv(range of cash flows)
C) =npv(discount rate, range of cash flows)
D) =npv(discount rate)
Question
In the four-stage planning process for selecting projects,____ is the last step.

A) project planning
B) resource allocation
C) business area analysis
D) strategic planning
Question
One method for selecting projects based on broad organizational needs is to first determine whether they meet three important criteria: need,____,and will.

A) ambition
B) practicality
C) funding
D) vision
Question
If you create the weighted scoring model in a spreadsheet,you can enter the data,create and copy formulas,and perform a "____" analysis.

A) scenario
B) query
C) what-if
D) hypothetical
Question
A ____ rate is the rate used in discounting future cash flows.

A) prime
B) markup
C) cash flow
D) discount
Question
Projects that address competitive ____ are much more likely to be successful because they will be important to the organization's competitive position.

A) value
B) products
C) tactics
D) strategy
Question
Projects should first and foremost address business ____.

A) portfolios
B) ventures
C) needs
D) practices
Question
An organization should consider only projects with a ____ NPV if financial value is a key criterion for project selection.

A) positive
B) negative
C) zero
D) well-defined
Question
Payback occurs in the year when the cumulative benefits minus costs reach ____.

A) ($1400)
B) ($100)
C) $0
D) $100
Question
A(n)____ scoring model is a tool that provides a systematic process for selecting projects based on many criteria.

A) weighted
B) biased
C) variable
D) opportunity
Question
____ period is the amount of time it will take to recoup-in the form of net cash inflows-the total dollars invested in a project.

A) Return
B) Payback
C) Accrual
D) Residual
Question
You calculate cash ____ by subtracting costs from benefits,or expenses from income.

A) flow
B) statements
C) budgets
D) structure
Question
A positive NPV means the return from a project exceeds the ____ cost of capital-the return available by investing the capital elsewhere.

A) fixed
B) variable
C) alternative
D) opportunity
Question
____ is the result of subtracting the project costs from the benefits and then dividing by the costs.

A) Return on investment
B) Internal Return Rate
C) NPV
D) The payback period
Question
An IT project in the ____ category could help transform the business.

A) growth
B) assessment
C) venture
D) discretionary
Question
You can determine a project's ____________________ by finding what discount rate results in an NPV of zero for the project.
Question
____ should be formed and continuously updated to help the organization as a whole make better strategic decisions.

A) Monitors
B) Portfolios
C) Projects
D) Programs
Question
A(n)____________________ rate is the rate used in discounting future cash flows.
Question
____________________ is the result of subtracting the project costs from the benefits and then dividing by the costs.
Question
____________________ planning involves determining long-term objectives by analyzing the strengths and weaknesses of an organization,studying opportunities and threats in the business environment,predicting future trends,and projecting the need for new products and services.
Question
The annual discount ____________________ is a multiplier for each year that is based on the discount rate and year.
Question
____ are new requirements imposed by government,management,or some external influence.

A) Directives
B) Problems
C) Opportunities
D) Thresholds
Question
NPV analysis is a method for making equal ____________________ between cash flow for multiyear projects.
Question
After deciding which projects to pursue,organizations need to decide if it is advantageous to manage several projects together as part of a(n)____.

A) aggregate
B) program
C) cluster
D) group
Question
Studies show that one of the main reasons people quit their jobs is because ____.

A) there is too much risk
B) they feel they do not make enough money
C) they feel they do not make a difference
D) they feel overworked
Question
An organization can view project portfolio management as having ____ levels,from simplest to most complex.

A) two
B) five
C) six
D) ten
Question
____________________ analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time.
Question
You can establish weights by assigning ____.

A) results
B) values
C) scores
D) points
Question
In portfolio management the "____" task should occur first.

A) prioritize projects on a list
B) apply modern portfolio theory
C) divide projects into investment categories
D) put all projects in one list
Question
____________________ analysis determines how much time will lapse before accrued benefits overtake accrued and continuing costs.
Question
____________________ considerations are often an important aspect of the project selection process,especially during tough economic times.
Question
A SWOT analysis involves the examination of Strengths,Weaknesses,Opportunities,and ____________________.
Question
An IT project in the ____ category must be accomplished to run the business.

A) ancillary
B) redundant
C) growth
D) core
Question
The goal of ____ portfolio management is clear: to help maximize business value to ensure enterprise success.

A) investment
B) interest
C) project
D) program
Question
Describe how problems,opportunities,and directives can drive the project selection process.
Question
It is important for organizations to develop a fair,consistent,and logical process for selecting projects,programs,and ____________________.
Question
Describe the role of the project portfolio manager in relation to the roles of project manager and program manager.
Question
A balanced ____________________ is a methodology that converts an organization's value drivers-such as customer service,innovation,operational efficiency,and financial performance-to a series of defined metrics.
Question
A(n)____________________ is a group of projects managed in a coordinated way to obtain benefits and control not available from managing them individually.
Question
Provide two examples demonstrating the value of identifying projects through the observation of day-to-day operations.
Question
The core category of IT projects labeled as ____________________ costs must be funded for a company to stay in business.
Question
Project portfolio management focuses on ____________________ issues while individual projects often focus on tactical issues.
Question
Grouping related ____________________ into programs helps improve coordination through better communications,planning,management,and control.
Question
Describe how coordinating housing projects within one program can lead to saving time and increasing authority.
Question
When creating a weighted scoring model,how do you identify criteria important to the project selection process?
Question
A program for IT ____________________ projects might include purchasing new hardware,software,and networking equipment,or determining standards for IT.
Question
____________________ projects helps you see the big picture,such as how many projects are supporting a growth strategy,how many are helping to increase profit margins,how many relate to marketing,and how many relate to materials.
Question
You can determine minimum scores or ____________________ for specific criteria in a weighted scoring model.
Question
A construction firm using ____________________ of scale can purchase materials,obtain services,and hire workers for less money if it is managing the construction of 100 houses instead of just one house.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/75
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 2: Project, program, and Portfolio Selection
1
According to Dr.Robert Kaplan and Dr.David Norton,a balanced scorecard rejects most traditional financial measures.
False
2
When using the hierarchical four-stage planning process for selecting projects,you must start at the bottom of the pyramid.
False
3
Low- or medium-priority projects that can be finished in less time than high-priority projects should always be completed first.
False
4
Organizations need to narrow down the list of potential projects to those projects that will be most beneficial.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
5
Projects with higher NPVs are preferred to projects with lower NPVs if all other factors are equal.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
6
Payback occurs in the year when the cumulative benefits minus costs reach zero.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
7
Money earned today is worth more than money earned in the future,primarily due to inflation.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
8
Some core projects can be high risk,have high value,and require good timing.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
9
In practice,organizations usually use a single approach to select projects.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
10
If you assign weights to criteria based on percentage,the sum of all the criteria's weights must total 100 percent.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
11
Organizations should only pursue projects that have the best financial value.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
12
The main goal of programs is to obtain benefits and control not available from managing projects separately.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
13
Organizations-both large and small-cannot undertake most of the potential projects identified because of resource limitations and other constraints.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
14
A weighted scoring model is a tool that provides a systematic process for selecting projects based on many criteria.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
15
Most crucial projects,such as drug development or major transportation projects,will achieve payback in less than a year.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
16
An organization should consider only projects with a negative NPV if financial value is a key criterion for project selection.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
17
From the viewpoint of NPV only,if Project 2 has a higher NPV than Project 1,Project 1 should be chosen.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
18
The required rate of return is the minimum acceptable rate of return on an investment.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
19
With respect to NPV,all organizations start discounting in Year 0 (immediately).
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
20
Just as projects are unique,so are project portfolios.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
21
Given discounted benefits of $516,000 and discounted costs of $243,200,your ROI is ____ %.

A) 10
B) 89
C) 112
D) 212
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
22
After assigning weights for the criteria and scores for each project,you calculate a weighted score for each project by multiplying the weight for each criterion by its score and ____ the resulting values.

A) multiplying
B) adding
C) dividing
D) subtracting
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
23
The SWOT analysis looks at ____.

A) Services, Weaknesses, Opportunities and Threats
B) Strengths, Weaknesses, Objectives and Threats
C) Strengths, Weaknesses, Opportunities and Threads
D) Strengths, Weaknesses, Opportunities and Threats
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
24
According to the ____ value of money,a dollar today is worth more than a dollar tomorrow.

A) financial
B) time
C) economic
D) discretionary
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
25
Three primary methods for determining the projected financial value of projects include net present value analysis,return on investment,and ____ analysis.

A) growth
B) payback
C) environmental impact
D) efficiency
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
26
Project managers must be sure to check with their organization to find out its guidelines for when discounting starts,what discount rate to use,and what ____ the organization prefers.

A) charts
B) technique
C) format
D) results
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following formulas is used by Excel to calculate NPV?

A) =npv()
B) =npv(range of cash flows)
C) =npv(discount rate, range of cash flows)
D) =npv(discount rate)
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
28
In the four-stage planning process for selecting projects,____ is the last step.

A) project planning
B) resource allocation
C) business area analysis
D) strategic planning
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
29
One method for selecting projects based on broad organizational needs is to first determine whether they meet three important criteria: need,____,and will.

A) ambition
B) practicality
C) funding
D) vision
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
30
If you create the weighted scoring model in a spreadsheet,you can enter the data,create and copy formulas,and perform a "____" analysis.

A) scenario
B) query
C) what-if
D) hypothetical
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
31
A ____ rate is the rate used in discounting future cash flows.

A) prime
B) markup
C) cash flow
D) discount
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
32
Projects that address competitive ____ are much more likely to be successful because they will be important to the organization's competitive position.

A) value
B) products
C) tactics
D) strategy
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
33
Projects should first and foremost address business ____.

A) portfolios
B) ventures
C) needs
D) practices
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
34
An organization should consider only projects with a ____ NPV if financial value is a key criterion for project selection.

A) positive
B) negative
C) zero
D) well-defined
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
35
Payback occurs in the year when the cumulative benefits minus costs reach ____.

A) ($1400)
B) ($100)
C) $0
D) $100
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
36
A(n)____ scoring model is a tool that provides a systematic process for selecting projects based on many criteria.

A) weighted
B) biased
C) variable
D) opportunity
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
37
____ period is the amount of time it will take to recoup-in the form of net cash inflows-the total dollars invested in a project.

A) Return
B) Payback
C) Accrual
D) Residual
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
38
You calculate cash ____ by subtracting costs from benefits,or expenses from income.

A) flow
B) statements
C) budgets
D) structure
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
39
A positive NPV means the return from a project exceeds the ____ cost of capital-the return available by investing the capital elsewhere.

A) fixed
B) variable
C) alternative
D) opportunity
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
40
____ is the result of subtracting the project costs from the benefits and then dividing by the costs.

A) Return on investment
B) Internal Return Rate
C) NPV
D) The payback period
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
41
An IT project in the ____ category could help transform the business.

A) growth
B) assessment
C) venture
D) discretionary
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
42
You can determine a project's ____________________ by finding what discount rate results in an NPV of zero for the project.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
43
____ should be formed and continuously updated to help the organization as a whole make better strategic decisions.

A) Monitors
B) Portfolios
C) Projects
D) Programs
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
44
A(n)____________________ rate is the rate used in discounting future cash flows.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
45
____________________ is the result of subtracting the project costs from the benefits and then dividing by the costs.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
46
____________________ planning involves determining long-term objectives by analyzing the strengths and weaknesses of an organization,studying opportunities and threats in the business environment,predicting future trends,and projecting the need for new products and services.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
47
The annual discount ____________________ is a multiplier for each year that is based on the discount rate and year.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
48
____ are new requirements imposed by government,management,or some external influence.

A) Directives
B) Problems
C) Opportunities
D) Thresholds
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
49
NPV analysis is a method for making equal ____________________ between cash flow for multiyear projects.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
50
After deciding which projects to pursue,organizations need to decide if it is advantageous to manage several projects together as part of a(n)____.

A) aggregate
B) program
C) cluster
D) group
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
51
Studies show that one of the main reasons people quit their jobs is because ____.

A) there is too much risk
B) they feel they do not make enough money
C) they feel they do not make a difference
D) they feel overworked
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
52
An organization can view project portfolio management as having ____ levels,from simplest to most complex.

A) two
B) five
C) six
D) ten
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
53
____________________ analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
54
You can establish weights by assigning ____.

A) results
B) values
C) scores
D) points
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
55
In portfolio management the "____" task should occur first.

A) prioritize projects on a list
B) apply modern portfolio theory
C) divide projects into investment categories
D) put all projects in one list
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
56
____________________ analysis determines how much time will lapse before accrued benefits overtake accrued and continuing costs.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
57
____________________ considerations are often an important aspect of the project selection process,especially during tough economic times.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
58
A SWOT analysis involves the examination of Strengths,Weaknesses,Opportunities,and ____________________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
59
An IT project in the ____ category must be accomplished to run the business.

A) ancillary
B) redundant
C) growth
D) core
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
60
The goal of ____ portfolio management is clear: to help maximize business value to ensure enterprise success.

A) investment
B) interest
C) project
D) program
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
61
Describe how problems,opportunities,and directives can drive the project selection process.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
62
It is important for organizations to develop a fair,consistent,and logical process for selecting projects,programs,and ____________________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
63
Describe the role of the project portfolio manager in relation to the roles of project manager and program manager.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
64
A balanced ____________________ is a methodology that converts an organization's value drivers-such as customer service,innovation,operational efficiency,and financial performance-to a series of defined metrics.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
65
A(n)____________________ is a group of projects managed in a coordinated way to obtain benefits and control not available from managing them individually.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
66
Provide two examples demonstrating the value of identifying projects through the observation of day-to-day operations.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
67
The core category of IT projects labeled as ____________________ costs must be funded for a company to stay in business.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
68
Project portfolio management focuses on ____________________ issues while individual projects often focus on tactical issues.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
69
Grouping related ____________________ into programs helps improve coordination through better communications,planning,management,and control.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
70
Describe how coordinating housing projects within one program can lead to saving time and increasing authority.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
71
When creating a weighted scoring model,how do you identify criteria important to the project selection process?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
72
A program for IT ____________________ projects might include purchasing new hardware,software,and networking equipment,or determining standards for IT.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
73
____________________ projects helps you see the big picture,such as how many projects are supporting a growth strategy,how many are helping to increase profit margins,how many relate to marketing,and how many relate to materials.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
74
You can determine minimum scores or ____________________ for specific criteria in a weighted scoring model.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
75
A construction firm using ____________________ of scale can purchase materials,obtain services,and hire workers for less money if it is managing the construction of 100 houses instead of just one house.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 75 flashcards in this deck.