Deck 21: Master Scheduling and Material Requirements Planning

Full screen (f)
exit full mode
Question
18)Which system calculates materials,subassemblies,and components required for end item production?

A)production planner
B)master production schedule
C)capacity requirements planning
D)materials requirements planning
Use Space or
up arrow
down arrow
to flip the card.
Question
16)A continuous production process is most likely linked to which manufacturing environment?

A)MTO
B)ATO
C)MTS
D)ETO
Question
19)The process of scheduling receipt of inventories,raw materials,and components as needed is called ______.

A)horizon planning
B)time phasing
C)time scheduling
D)materials scheduling
Question
20)What is the process of breaking down an end item into the components and materials required called?

A)MRP explosion
B)Netting
C)Lot sizing
D)Inventory phasing
Question
8)Which one of the following is a variable to be considered when calculating production lot size?

A)forecasted demand
B)customer order
C)the lower of customer orders and forecasted demand
D)the higher of customer orders and forecasted demand
Question
14)Changes to the master schedule during the frozen time fence may be requested only by the ______.

A)master scheduler
B)senior executive
C)production planner
D)inventory manager
Question
7)Uncommitted inventory that is physically on-hand is called ______.

A)ready-to-buy
B)ready-to-sell
C)made-to-stock
D)available-to-promise
Question
3)To facilitate production,it is necessary to ______.

A)aggregate items to product families
B)disaggregate products to end items
C)create pegging report
D)create where used analysis
Question
5)The output of the master schedule is a(n)______.

A)materials requirement plan
B)operations plan
C)master production schedule
D)production plan
Question
15)The current time bucket lies in which time fence?

A)frozen
B)slushy
C)flexible
D)none of these
Question
13)The time intervals used in master scheduling are called ______.

A)time buckets
B)weekly intervals
C)planning horizons
D)lot sizes
Question
17)A final assembly schedule is a part of the MPS in which manufacturing environment?

A)ATO
B)MTO
C)MTS
D)ETO
Question
2)Operations plans in the medium to short term are done during ______.

A)detailed scheduling
B)materials requirement planning
C)sales and operations planning
D)master scheduling
Question
11)The effectiveness of a master schedule depends on the ______.

A)interface with the S&OP process
B)interface with the production plan
C)interface with all other functional areas of the organization
D)ability to operate on as a standalone system
Question
12)The planning horizons of master scheduling are determined ______.

A)by executive management
B)by the products being produced
C)by strategic planning
D)by production capacity
Question
1)Which of the following is relevant to operations and supply chain management?

A)decisions related to identifying the right product for a target market
B)decisions related to strategy,tactics,and operations
C)decisions related to identifying the right price for a product
D)decisions related to identifying the right advertising media for a product
Question
4)The master schedule reflects demand from ______.

A)final customers only
B)all possible sources in an organization
C)demand forecasts only
D)internal customers only
Question
9)A production lot size is scheduled when on-hand inventory falls ______.

A)to zero
B)below safety stock
C)below zero
D)below safety stock or below zero
Question
10)Sufficiency of capacity for the output of the master schedule is checked during ______.

A)materials requirement planning
B)capacity requirements planning
C)rough cut capacity planning
D)production resource planning
Question
6)Which of the following is NOT an input to master scheduling?

A)demand forecasts
B)customer orders
C)inventory on-hand
D)product quality
Question
28)Item A has a lead time of 2 weeks and requires two units of Item B and three units of Item C.Item B has a lead time of 4 weeks; Item C has a lead time of 1 week.What should the planning horizon of the MRP be?

A)2 weeks
B)at least 6 weeks
C)always less than 6 weeks
D)3 weeks
Question
34)To minimize the effects of uncertainty due to lead times,MRP systems incorporate ______.

A)safety stock
B)safety lead time
C)planned released orders
D)increase in production
Question
37)In fixed-period ordering technique,______.

A)the order interval is fixed
B)the order quantity is variable
C)both A and B
D)neither A nor B
Question
32)An approach to reducing the effect of nervousness in an MRP system is to use ______.

A)performance of reports
B)immediate feedback
C)scheduled planned orders
D)firm planned orders
Question
39)A benefit of MRP is the ______.

A)reduction in work-in-progress inventory
B)increase in work-in-progress inventory
C)increase in finished-goods inventory
D)increase in inventory costs
Question
22)Which of the following is an output of MRP?

A)master production schedule
B)rough-cut capacity plan
C)planned order releases
D)bill of materials
Question
25)What is the process that identifies which parent item has generated requirements for a component called?

A)where-used analysis
B)splitting
C)pegging
D)netting
Question
33)The changes in firm planned orders ______.

A)happen automatically upon changes to conditions
B)require approval from senior managers
C)can be made by supervisors on the production floor
D)can be made by customers alone
Question
38)In part-period balancing lot-sizing technique,______.

A)the order interval is fixed
B)the order quantity is variable
C)the order quantity depends on price
D)the order quantity depends on safety stock
Question
23)Which file contains data about materials,components,parts,and the assembling sequence of an end item?

A)bill of materials
B)materials requirement
C)master production
D)materials requirement plan
Question
30)The changes in a net-change MRP system ______.

A)cause the entire production plan to regenerate
B)affect only those components whose information has been changed or updated
C)explode the bill of materials
D)cause shutdown of the production process
Question
21)Which of the following is an input to MRP?

A)customer orders
B)an operations plan
C)a bill of materials file
D)a sales plan
Question
26)Which of the following reports can be used to track problems and evaluate MRP system performance?

A)performance control reports
B)exception reports
C)MRP execution reports
D)MRP planning reports
Question
35)The lot-sizing technique which almost eliminates inventory-holding costs is ______.

A)lot for lot
B)economic order quantity
C)economic production quantity
D)fixed-order quantity
Question
24)Net requirements is calculated as ______.

A)Gross requirements + on-hand inventory
B)Gross requirements - on-hand inventory
C)Gross requirements x on-hand inventory
D)Gross requirements ÷ on-hand inventory
Question
36)In lot-for-lot lot sizing,______.

A)inventory holding costs are high
B)holding and ordering costs are balanced
C)setup and ordering costs are high
D)setup and ordering costs are low
Question
40)Backflushing is a process where an end item's BOM is exploded to ______.

A)determine materials and components that will be required
B)determine materials and components that were used
C)determine capacity requirements from production of end items
D)determine capacity that was used for production of end items
Question
27)Which of the following reports call for a manager's attention to major problems?

A)andons
B)MRP alarm reports
C)Kanban cards
D)exception reports
Question
31)Frequent changes to an MRP system cause the ______.

A)generation of firm planned orders
B)production of exception reports
C)shutdown of the MRP system
D)nervousness in the MRP system
Question
29)Updating or replanning the MRP records is performed periodically in which type of system?

A)regenerative MRP system
B)period MRP system
C)dynamic MRP system
D)time-phased MRP system
Question
56)A standard quantity issued to the production process is called ______.

A)lot size
B)production batch
C)job batch
D)production run
Question
49)When a company has a reputation of being environmentally unfriendly,______.

A)investors will favor it as the operating costs will generally be lower
B)investors will not favor it as the operating costs will be high
C)customers will prefer to buy its products
D)customers will prefer not to buy its products
Question
42)A JIT system schedules ______.

A)parts
B)capacity
C)MPS
D)operations
Question
41)MRP systems ensure that materials and components are available ______.

A)based on demand forecasts
B)when actual orders are received
C)based on seasonality
D)based on product price
Question
47)MRP principles applied in the services industry can be called ______.

A)service resource planning
B)labor requirement planning
C)service requirement planning
D)resource requirement planning
Question
57)What is the most important factor in choosing a lot-sizing technique?

A)inventory purchasing cost
B)inventory holding cost
C)demand pattern of product
D)perishability of product
Question
43)An MRP system works best in ______.

A)a pull system
B)a push system
C)both A and B
D)either A or B
Question
58)The process of updating the master schedule and moving from one period to the next is called ______.

A)rolling schedule
B)forward schedule
C)backward schedule
D)replanning of the planning horizon
Question
48)When a company is not environmentally friendly ______.

A)investors will seize the opportunity to invest more
B)investors are very unlikely to make investments
C)it will enjoy a greater market share
D)consumers will definitely prefer to buy its products
Question
44)An additional input to an integrated MRP and JIT system is the ______.

A)bill of materials file
B)inventory records
C)master schedule
D)bill of operations file
Question
53)Checking for available capacity at the materials requirements planning level is done in which process?

A)master scheduling
B)capacity requirements planning
C)resource planning
D)rough-cut capacity planning
Question
54)Master scheduling deals with products at what level?

A)aggregated production
B)aggregated product family
C)disaggregated end items
D)exploded into materials and subassemblies
Question
52)The output of individual production quantities of the end items to be produced at various points of the short-term planning horizon is called ______.

A)available-to-promise (ATP)inventory
B)the master production schedule (MPS)
C)sales and operations planning
D)rough-cut capacity planning
Question
50)The sales and operations plan designs products at what level?

A)aggregate level
B)end-item level
C)materials and components level
D)materials,subassemblies,and capacity level
Question
55)The amount of a particular item ordered from a supplier is called the ______.

A)lot size
B)batch
C)consignment
D)quantity of shipment
Question
51)The process of breaking down product family requirements into individual end items is called ______.

A)disaggregating
B)aggregating
C)netting
D)explosion of BOM
Question
45)Which file provides information on machine capacity,machine time cost per unit,operation process time,and setup time?

A)bill of operations
B)capacity requirements file
C)master schedule
D)standard time database
Question
46)An output of integrated MRP-JIT systems,which is unavailable in an only-MRP system,is a ______.

A)performance report
B)time phased material requirement
C)total production cost
D)production schedule
Question
59)Changes in which phase of the MPS will be the most disruptive?

A)frozen time fence
B)slushy time fence
C)flexible time fence
D)disruptive in all phases
Question
60)Changes in which phase of the MPS will be the least disruptive?

A)frozen time fence
B)slushy time fence
C)flexible time fence
D)not disruptive in any phase
Question
70)The time when raw materials,components,or subassemblies are required is called the ______.

A)due date
B)lead time
C)time phase
D)pegging time
Question
66)The focus of the master schedule in an MTO production environment is ______.

A)producing finished goods to meet inventory and customer service levels
B)ensuring that capacity is available to begin production upon receipt of order
C)ensuring that raw materials are readily available to begin production upon receipt of order
D)continuously producing finished goods irrespective of inventory level
Question
72)The time between placing an order and receiving the item is called ______.

A)lead time
B)lag time
C)due date
D)order time
Question
80)Information about supplier,lead time,and lot-size policy is contained in the ______.

A)bill of materials file
B)bill of operations file
C)materials plan
D)inventory status file
Question
75)Lots that are expected to be received in a particular period are ______.

A)planned order receipts
B)scheduled receipts
C)planned lot receipts
D)planned inventory receipts
Question
68)The production plan or procurement plan for raw materials and components for independent demand items is done in ______.

A)S&OP
B)materials requirement planning
C)master scheduling
D)detailed scheduled planning
Question
78)Which is the primary input to the MRP process?

A)bill of materials
B)master schedule
C)bill of operations
D)inventory status file
Question
77)The difference in time between planned order release and planned order receipt ______.

A)ensures safety lead time
B)depends on lead time required
C)depends on inventory holding cost
D)is called time phasing
Question
61)The process of dividing the master scheduling planning horizon to allow for different rules for making changes is called ______.

A)MPS splitting
B)MPS dividing
C)time fencing
D)planning horizon division
Question
67)Which production environment handles products that are custom designed and built to specific requirements?

A)MTO
B)MTS
C)ATO
D)ETO
Question
62)Filling customer orders received in the frozen time fence may require various considerations.Which of the following is NOT such a consideration?

A)expedited procurement of raw materials
B)postponing another order
C)expedited production
D)skipping quality controls
Question
74)The leftover inventory from previous periods that is available at the start of a period is called ______.

A)leftover inventory
B)projected available balance
C)on-hand inventory
D)available to promise
Question
64)The focus of the master schedule in an ATO production environment is ______.

A)to produce finished goods to meet inventory and customer service levels
B)to produce components,modules and subassemblies ready to be assembled based on order
C)to ensure that capacity is available for assembling end product when order is received
D)to produce standardized modules and subassemblies
Question
76)The difference between scheduled receipts and planned order receipts is that ______.

A)no difference
B)planned order receipts are for orders already placed,scheduled receipts show quantity that is expected to be received
C)scheduled receipts are for orders already placed,planned order receipts show quantity that is expected to be received
D)planned order receipts authorize scheduled receipts
Question
69)The production plan or procurement plan for raw materials and components for dependent demand items is done in ______.

A)S&OP
B)materials requirement planning
C)master scheduling
D)detailed scheduled planning
Question
63)The focus of the master schedule in an MTS production environment is ______.

A)to produce finished goods to meet inventory and customer service levels
B)to produce components ready to be assembled upon receipt of customer order
C)to ensure that raw materials are readily available to being production upon receipt of order
D)to continuously produce finished goods irrespective of inventory level
Question
73)The time at which materials that have already been ordered will arrive is called ______.

A)planned order receipt
B)planned order release
C)scheduled receipt
D)scheduled order arrival
Question
71)The process of making raw materials,components,parts,or subassemblies available only when they're actually required is called ______.

A)netting
B)pegging
C)time phasing
D)safety lead time logic
Question
65)In an ATO production environment,which process is used to assemble modules and subassemblies into final product?

A)final assembly schedule
B)master scheduling Part II
C)module requirements planning
D)assembly requirements planning
Question
79)A method of representing the product hierarchy of a BOM file is the ______.

A)Ishikawa diagram
B)process-component matrix
C)product structure tree
D)fishbone diagram
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 21: Master Scheduling and Material Requirements Planning
1
18)Which system calculates materials,subassemblies,and components required for end item production?

A)production planner
B)master production schedule
C)capacity requirements planning
D)materials requirements planning
D
2
16)A continuous production process is most likely linked to which manufacturing environment?

A)MTO
B)ATO
C)MTS
D)ETO
C
3
19)The process of scheduling receipt of inventories,raw materials,and components as needed is called ______.

A)horizon planning
B)time phasing
C)time scheduling
D)materials scheduling
B
4
20)What is the process of breaking down an end item into the components and materials required called?

A)MRP explosion
B)Netting
C)Lot sizing
D)Inventory phasing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
5
8)Which one of the following is a variable to be considered when calculating production lot size?

A)forecasted demand
B)customer order
C)the lower of customer orders and forecasted demand
D)the higher of customer orders and forecasted demand
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
6
14)Changes to the master schedule during the frozen time fence may be requested only by the ______.

A)master scheduler
B)senior executive
C)production planner
D)inventory manager
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
7
7)Uncommitted inventory that is physically on-hand is called ______.

A)ready-to-buy
B)ready-to-sell
C)made-to-stock
D)available-to-promise
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
8
3)To facilitate production,it is necessary to ______.

A)aggregate items to product families
B)disaggregate products to end items
C)create pegging report
D)create where used analysis
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
9
5)The output of the master schedule is a(n)______.

A)materials requirement plan
B)operations plan
C)master production schedule
D)production plan
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
10
15)The current time bucket lies in which time fence?

A)frozen
B)slushy
C)flexible
D)none of these
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
11
13)The time intervals used in master scheduling are called ______.

A)time buckets
B)weekly intervals
C)planning horizons
D)lot sizes
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
12
17)A final assembly schedule is a part of the MPS in which manufacturing environment?

A)ATO
B)MTO
C)MTS
D)ETO
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
13
2)Operations plans in the medium to short term are done during ______.

A)detailed scheduling
B)materials requirement planning
C)sales and operations planning
D)master scheduling
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
14
11)The effectiveness of a master schedule depends on the ______.

A)interface with the S&OP process
B)interface with the production plan
C)interface with all other functional areas of the organization
D)ability to operate on as a standalone system
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
15
12)The planning horizons of master scheduling are determined ______.

A)by executive management
B)by the products being produced
C)by strategic planning
D)by production capacity
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
16
1)Which of the following is relevant to operations and supply chain management?

A)decisions related to identifying the right product for a target market
B)decisions related to strategy,tactics,and operations
C)decisions related to identifying the right price for a product
D)decisions related to identifying the right advertising media for a product
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
17
4)The master schedule reflects demand from ______.

A)final customers only
B)all possible sources in an organization
C)demand forecasts only
D)internal customers only
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
18
9)A production lot size is scheduled when on-hand inventory falls ______.

A)to zero
B)below safety stock
C)below zero
D)below safety stock or below zero
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
19
10)Sufficiency of capacity for the output of the master schedule is checked during ______.

A)materials requirement planning
B)capacity requirements planning
C)rough cut capacity planning
D)production resource planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
20
6)Which of the following is NOT an input to master scheduling?

A)demand forecasts
B)customer orders
C)inventory on-hand
D)product quality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
21
28)Item A has a lead time of 2 weeks and requires two units of Item B and three units of Item C.Item B has a lead time of 4 weeks; Item C has a lead time of 1 week.What should the planning horizon of the MRP be?

A)2 weeks
B)at least 6 weeks
C)always less than 6 weeks
D)3 weeks
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
22
34)To minimize the effects of uncertainty due to lead times,MRP systems incorporate ______.

A)safety stock
B)safety lead time
C)planned released orders
D)increase in production
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
23
37)In fixed-period ordering technique,______.

A)the order interval is fixed
B)the order quantity is variable
C)both A and B
D)neither A nor B
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
24
32)An approach to reducing the effect of nervousness in an MRP system is to use ______.

A)performance of reports
B)immediate feedback
C)scheduled planned orders
D)firm planned orders
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
25
39)A benefit of MRP is the ______.

A)reduction in work-in-progress inventory
B)increase in work-in-progress inventory
C)increase in finished-goods inventory
D)increase in inventory costs
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
26
22)Which of the following is an output of MRP?

A)master production schedule
B)rough-cut capacity plan
C)planned order releases
D)bill of materials
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
27
25)What is the process that identifies which parent item has generated requirements for a component called?

A)where-used analysis
B)splitting
C)pegging
D)netting
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
28
33)The changes in firm planned orders ______.

A)happen automatically upon changes to conditions
B)require approval from senior managers
C)can be made by supervisors on the production floor
D)can be made by customers alone
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
29
38)In part-period balancing lot-sizing technique,______.

A)the order interval is fixed
B)the order quantity is variable
C)the order quantity depends on price
D)the order quantity depends on safety stock
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
30
23)Which file contains data about materials,components,parts,and the assembling sequence of an end item?

A)bill of materials
B)materials requirement
C)master production
D)materials requirement plan
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
31
30)The changes in a net-change MRP system ______.

A)cause the entire production plan to regenerate
B)affect only those components whose information has been changed or updated
C)explode the bill of materials
D)cause shutdown of the production process
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
32
21)Which of the following is an input to MRP?

A)customer orders
B)an operations plan
C)a bill of materials file
D)a sales plan
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
33
26)Which of the following reports can be used to track problems and evaluate MRP system performance?

A)performance control reports
B)exception reports
C)MRP execution reports
D)MRP planning reports
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
34
35)The lot-sizing technique which almost eliminates inventory-holding costs is ______.

A)lot for lot
B)economic order quantity
C)economic production quantity
D)fixed-order quantity
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
35
24)Net requirements is calculated as ______.

A)Gross requirements + on-hand inventory
B)Gross requirements - on-hand inventory
C)Gross requirements x on-hand inventory
D)Gross requirements ÷ on-hand inventory
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
36
36)In lot-for-lot lot sizing,______.

A)inventory holding costs are high
B)holding and ordering costs are balanced
C)setup and ordering costs are high
D)setup and ordering costs are low
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
37
40)Backflushing is a process where an end item's BOM is exploded to ______.

A)determine materials and components that will be required
B)determine materials and components that were used
C)determine capacity requirements from production of end items
D)determine capacity that was used for production of end items
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
38
27)Which of the following reports call for a manager's attention to major problems?

A)andons
B)MRP alarm reports
C)Kanban cards
D)exception reports
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
39
31)Frequent changes to an MRP system cause the ______.

A)generation of firm planned orders
B)production of exception reports
C)shutdown of the MRP system
D)nervousness in the MRP system
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
40
29)Updating or replanning the MRP records is performed periodically in which type of system?

A)regenerative MRP system
B)period MRP system
C)dynamic MRP system
D)time-phased MRP system
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
41
56)A standard quantity issued to the production process is called ______.

A)lot size
B)production batch
C)job batch
D)production run
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
42
49)When a company has a reputation of being environmentally unfriendly,______.

A)investors will favor it as the operating costs will generally be lower
B)investors will not favor it as the operating costs will be high
C)customers will prefer to buy its products
D)customers will prefer not to buy its products
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
43
42)A JIT system schedules ______.

A)parts
B)capacity
C)MPS
D)operations
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
44
41)MRP systems ensure that materials and components are available ______.

A)based on demand forecasts
B)when actual orders are received
C)based on seasonality
D)based on product price
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
45
47)MRP principles applied in the services industry can be called ______.

A)service resource planning
B)labor requirement planning
C)service requirement planning
D)resource requirement planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
46
57)What is the most important factor in choosing a lot-sizing technique?

A)inventory purchasing cost
B)inventory holding cost
C)demand pattern of product
D)perishability of product
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
47
43)An MRP system works best in ______.

A)a pull system
B)a push system
C)both A and B
D)either A or B
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
48
58)The process of updating the master schedule and moving from one period to the next is called ______.

A)rolling schedule
B)forward schedule
C)backward schedule
D)replanning of the planning horizon
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
49
48)When a company is not environmentally friendly ______.

A)investors will seize the opportunity to invest more
B)investors are very unlikely to make investments
C)it will enjoy a greater market share
D)consumers will definitely prefer to buy its products
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
50
44)An additional input to an integrated MRP and JIT system is the ______.

A)bill of materials file
B)inventory records
C)master schedule
D)bill of operations file
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
51
53)Checking for available capacity at the materials requirements planning level is done in which process?

A)master scheduling
B)capacity requirements planning
C)resource planning
D)rough-cut capacity planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
52
54)Master scheduling deals with products at what level?

A)aggregated production
B)aggregated product family
C)disaggregated end items
D)exploded into materials and subassemblies
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
53
52)The output of individual production quantities of the end items to be produced at various points of the short-term planning horizon is called ______.

A)available-to-promise (ATP)inventory
B)the master production schedule (MPS)
C)sales and operations planning
D)rough-cut capacity planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
54
50)The sales and operations plan designs products at what level?

A)aggregate level
B)end-item level
C)materials and components level
D)materials,subassemblies,and capacity level
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
55
55)The amount of a particular item ordered from a supplier is called the ______.

A)lot size
B)batch
C)consignment
D)quantity of shipment
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
56
51)The process of breaking down product family requirements into individual end items is called ______.

A)disaggregating
B)aggregating
C)netting
D)explosion of BOM
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
57
45)Which file provides information on machine capacity,machine time cost per unit,operation process time,and setup time?

A)bill of operations
B)capacity requirements file
C)master schedule
D)standard time database
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
58
46)An output of integrated MRP-JIT systems,which is unavailable in an only-MRP system,is a ______.

A)performance report
B)time phased material requirement
C)total production cost
D)production schedule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
59
59)Changes in which phase of the MPS will be the most disruptive?

A)frozen time fence
B)slushy time fence
C)flexible time fence
D)disruptive in all phases
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
60
60)Changes in which phase of the MPS will be the least disruptive?

A)frozen time fence
B)slushy time fence
C)flexible time fence
D)not disruptive in any phase
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
61
70)The time when raw materials,components,or subassemblies are required is called the ______.

A)due date
B)lead time
C)time phase
D)pegging time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
62
66)The focus of the master schedule in an MTO production environment is ______.

A)producing finished goods to meet inventory and customer service levels
B)ensuring that capacity is available to begin production upon receipt of order
C)ensuring that raw materials are readily available to begin production upon receipt of order
D)continuously producing finished goods irrespective of inventory level
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
63
72)The time between placing an order and receiving the item is called ______.

A)lead time
B)lag time
C)due date
D)order time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
64
80)Information about supplier,lead time,and lot-size policy is contained in the ______.

A)bill of materials file
B)bill of operations file
C)materials plan
D)inventory status file
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
65
75)Lots that are expected to be received in a particular period are ______.

A)planned order receipts
B)scheduled receipts
C)planned lot receipts
D)planned inventory receipts
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
66
68)The production plan or procurement plan for raw materials and components for independent demand items is done in ______.

A)S&OP
B)materials requirement planning
C)master scheduling
D)detailed scheduled planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
67
78)Which is the primary input to the MRP process?

A)bill of materials
B)master schedule
C)bill of operations
D)inventory status file
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
68
77)The difference in time between planned order release and planned order receipt ______.

A)ensures safety lead time
B)depends on lead time required
C)depends on inventory holding cost
D)is called time phasing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
69
61)The process of dividing the master scheduling planning horizon to allow for different rules for making changes is called ______.

A)MPS splitting
B)MPS dividing
C)time fencing
D)planning horizon division
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
70
67)Which production environment handles products that are custom designed and built to specific requirements?

A)MTO
B)MTS
C)ATO
D)ETO
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
71
62)Filling customer orders received in the frozen time fence may require various considerations.Which of the following is NOT such a consideration?

A)expedited procurement of raw materials
B)postponing another order
C)expedited production
D)skipping quality controls
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
72
74)The leftover inventory from previous periods that is available at the start of a period is called ______.

A)leftover inventory
B)projected available balance
C)on-hand inventory
D)available to promise
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
73
64)The focus of the master schedule in an ATO production environment is ______.

A)to produce finished goods to meet inventory and customer service levels
B)to produce components,modules and subassemblies ready to be assembled based on order
C)to ensure that capacity is available for assembling end product when order is received
D)to produce standardized modules and subassemblies
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
74
76)The difference between scheduled receipts and planned order receipts is that ______.

A)no difference
B)planned order receipts are for orders already placed,scheduled receipts show quantity that is expected to be received
C)scheduled receipts are for orders already placed,planned order receipts show quantity that is expected to be received
D)planned order receipts authorize scheduled receipts
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
75
69)The production plan or procurement plan for raw materials and components for dependent demand items is done in ______.

A)S&OP
B)materials requirement planning
C)master scheduling
D)detailed scheduled planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
76
63)The focus of the master schedule in an MTS production environment is ______.

A)to produce finished goods to meet inventory and customer service levels
B)to produce components ready to be assembled upon receipt of customer order
C)to ensure that raw materials are readily available to being production upon receipt of order
D)to continuously produce finished goods irrespective of inventory level
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
77
73)The time at which materials that have already been ordered will arrive is called ______.

A)planned order receipt
B)planned order release
C)scheduled receipt
D)scheduled order arrival
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
78
71)The process of making raw materials,components,parts,or subassemblies available only when they're actually required is called ______.

A)netting
B)pegging
C)time phasing
D)safety lead time logic
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
79
65)In an ATO production environment,which process is used to assemble modules and subassemblies into final product?

A)final assembly schedule
B)master scheduling Part II
C)module requirements planning
D)assembly requirements planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
80
79)A method of representing the product hierarchy of a BOM file is the ______.

A)Ishikawa diagram
B)process-component matrix
C)product structure tree
D)fishbone diagram
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 100 flashcards in this deck.