Exam 21: Master Scheduling and Material Requirements Planning
Exam 1: Introduction to Managing Global Operations and Supply Chains97 Questions
Exam 2: Operations and Supply Chain Strategies99 Questions
Exam 3: Project Management100 Questions
Exam 4: Supplement: Project Management100 Questions
Exam 5: Product and Service Innovations100 Questions
Exam 6: Supplement: Reliability98 Questions
Exam 7: Managing for Quality100 Questions
Exam 8: Quality Improvement and Control Tools100 Questions
Exam 9: Capacity Planning100 Questions
Exam 10: Supply Chain Design and Location Planning100 Questions
Exam 11: Process Design and Layout Planning100 Questions
Exam 12: Supplement: Tools for Analyzing, Designing, and Selecting Processes and Layouts99 Questions
Exam 13: Supplier Management100 Questions
Exam 14: Logistics Management100 Questions
Exam 15: Demand Management and Customer Service100 Questions
Exam 16: Demand Forecasting Methods100 Questions
Exam 17: Lean Operations and Supply Chains99 Questions
Exam 18: Inventory Management100 Questions
Exam 19: Inventory Control Models100 Questions
Exam 20: Sales and Operations Planning99 Questions
Exam 21: Master Scheduling and Material Requirements Planning100 Questions
Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP100 Questions
Exam 23: Detailed Scheduling100 Questions
Exam 24: Linear Programming100 Questions
Exam 25: The Transportation Models100 Questions
Exam 26: Waiting Line Models100 Questions
Exam 27: Simulation100 Questions
Exam 28: Learning Curves99 Questions
Exam 29: Decision-Making Tools100 Questions
Select questions type
Item A has a lead time of 2 weeks and requires two units of Item B and three units of Item C.Item B has a lead time of 4 weeks; Item C has a lead time of 1 week.What should the planning horizon of the MRP be?
Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
B
A method of representing the product hierarchy of a BOM file is the ______.
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
C
Operations plans in the medium to short term are done during ______.
Free
(Multiple Choice)
4.7/5
(42)
Correct Answer:
D
When a company has a reputation of being environmentally unfriendly,______.
(Multiple Choice)
4.8/5
(26)
The focus of the master schedule in an MTO production environment is ______.
(Multiple Choice)
4.9/5
(36)
The process of dividing the master scheduling planning horizon to allow for different rules for making changes is called ______.
(Multiple Choice)
4.8/5
(37)
What is the most important factor in choosing a lot-sizing technique?
(Multiple Choice)
4.8/5
(42)
Which of the following reports call for a manager's attention to major problems?
(Multiple Choice)
4.8/5
(43)
The production plan or procurement plan for raw materials and components for dependent demand items is done in ______.
(Multiple Choice)
4.7/5
(33)
The production plan or procurement plan for raw materials and components for independent demand items is done in ______.
(Multiple Choice)
4.7/5
(36)
Sufficiency of capacity for the output of the master schedule is checked during ______.
(Multiple Choice)
4.7/5
(42)
Materials requirements planning deals with products at what level?
(Multiple Choice)
4.9/5
(30)
Updating or replanning the MRP records is performed periodically in which type of system?
(Multiple Choice)
4.8/5
(31)
With regard to capacity planning,the difference between an integrated MRP-JIT system and an only-MRP system is that ______.
(Multiple Choice)
4.8/5
(30)