Deck 10: It Project Quality Management
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/71
Play
Full screen (f)
Deck 10: It Project Quality Management
1
Black Belts and Champions are designations of leadership and competence under the Capacity Maturity Model CMM).
False
2
Control charts are used to highlight statistically significant variation in processes.
True
3
The key steps in the Six Sigma framework are the D-M-A-I-C cycle which stands for Define,Measure,Adapt,Innovate,and Control.
False
4
Verification activities focus on asking the question of whether we followed the right procedures and processes.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
5
The PMBOK definition of project quality management focuses on conformance to specifications.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
6
Variations that fall more than three standard deviations from the mean are attributed to assignable cause.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
7
PMBOK defines the major quality management processes as: conformance to requirements,fitness for use,and having a high degree of excellence.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
8
A process that is shown to have eight successive values that are more than two standard deviations away from the mean might be correctly categorized as stable and in statistical control.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
9
Most quality initiatives translate readily and require little if any corporate culture changes as evidenced by the Japanese adoption of Deming's quality philosophy.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
10
The Pareto Diagram is based on the notion that 20 percent of the problems are based on 80 percent of the causes
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
11
Validation is a process-oriented activity that focuses on the deployment of specific development procedures.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
12
Defect arrival rates,Defects by phase,and Fix Response time are all process metrics.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
13
ISO certification is a multinational effort to certify products,services,or systems that meet specified quality management principles.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
14
The use of development teams working collaboratively has increased the need for change control and configuration management.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
15
Eli Whitney is one of the central figures of the industrial revolution because of his concept of mass-producing interchangeable parts.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
16
Software process maturity represents the expected results that can be achieved by following a particular software process.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
17
Project quality control is an expense that should be minimized and incurred primarily in the testing phase of a project.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
18
Project Quality Management PQM)focuses on the project product and Project Control Management PCM)focuses on the project process.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
19
Taken together,the concepts of quality management,verification and validation,change control and knowledge management support the overall project quality management plan.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
20
Documenting lessons learned is an important part of continuous quality improvement.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
21
The quality system that grew out of a 1947 meeting with a mission of facilitating the international coordination and unification of industrial standards is part of the history of which quality system.
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)None of the above
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
22
_________ introduced the control chart to better understand process variations.
A)Eli Whitney
B)Frederic Taylor
C)Walter Shewhart
D)W)Edwards Deming
E)Joseph Juran
A)Eli Whitney
B)Frederic Taylor
C)Walter Shewhart
D)W)Edwards Deming
E)Joseph Juran
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
23
Within Six Sigma,the _____ step is used to identify the relevant metrics.
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
24
A list of 14 points for quality is associated with
A)Deming
B)Juran
C)Crosby
D)Capability Maturity Model CMM)
E)Ishikawa
A)Deming
B)Juran
C)Crosby
D)Capability Maturity Model CMM)
E)Ishikawa
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
25
_____was started by Motorola in the mid-1980's as a basis for measuring the quality of a process rather than the products it produces.
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)None of the above
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
26
The D-M-A-I-C cycle is part of:
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)Software Metrics Model SMM)
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)Software Metrics Model SMM)
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
27
__________ published the Quality Control Handbook which viewed quality as "fitness for use" as perceived by the customer.
A)Eli Whitney
B)Frederic Taylor
C)Walter Shewhart
D)W)Edwards Deming
E)Joseph Juran
A)Eli Whitney
B)Frederic Taylor
C)Walter Shewhart
D)W)Edwards Deming
E)Joseph Juran
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
28
A _____ is useful for identifying and investigating the most important problems by ranking them in descending order.
A)statistical chart
B)flow chart
C)pareto diagram
D)control chart
E)fishbone diagram
A)statistical chart
B)flow chart
C)pareto diagram
D)control chart
E)fishbone diagram
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
29
A _____ provides a picture of how a particular process is behaving over time by providing a chart with a center line and limits on either side of the center line.
A)statistical chart
B)flow chart
C)pareto diagram
D)control chart
E)fishbone diagram
A)statistical chart
B)flow chart
C)pareto diagram
D)control chart
E)fishbone diagram
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
30
Verification and validation of project deliverables should be carried out _____
A)at the beginning of the project
B)in the middle of the project
C)at the end of the project
D)throughout the project
E)there is no preferrable time to complete these activities
A)at the beginning of the project
B)in the middle of the project
C)at the end of the project
D)throughout the project
E)there is no preferrable time to complete these activities
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
31
________ is monitoring and documenting the results of executing project quality activities to eliminate causes of unsatisfactory performance and implement new processes and techniques to improve project quality throughout the organization.
A)Plan Quality
B)Perform Quality Assurance
C)Perform Quality Control
D)Project Quality Management
E)Quality Management Plan
A)Plan Quality
B)Perform Quality Assurance
C)Perform Quality Control
D)Project Quality Management
E)Quality Management Plan
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
32
A _____ refers to the activities,methods,materials,and measurements used to produce the product or service.
A)metric
B)performance indicator
C)quality indicator
D)process
E)quality chain
A)metric
B)performance indicator
C)quality indicator
D)process
E)quality chain
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
33
In general control limits are set at + or - ________ standard deviations which provides ________ probability limits.
A)3,.05
B)3,.001
C)2,.05
D)2,.01
E)1,.34
A)3,.05
B)3,.001
C)2,.05
D)2,.01
E)1,.34
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
34
The core values of quality programs proposed by Shewhart,Deming,Juran,Ishikawa,and Crosby include:
A)focus on the customer,
B)incremental or continuous improvement
C)problem detection and correction
D)measurement
E)all of these are part of the core values proposed.
A)focus on the customer,
B)incremental or continuous improvement
C)problem detection and correction
D)measurement
E)all of these are part of the core values proposed.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
35
A _____ is best developed by brainstorming with a learning cycle approach to identify and correct a particular problem.
A)statistical chart
B)flow chart
C)pareto diagram
D)control chart
E)fishbone diagram
A)statistical chart
B)flow chart
C)pareto diagram
D)control chart
E)fishbone diagram
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
36
________ is determining which quality requirements and/or standards are important for the project and the product and then documenting how compliance will be demonstrated.
A)Plan Quality
B)Perform Quality Assurance
C)Perform Quality Control
D)Project Quality Management
E)Quality Management Plan
A)Plan Quality
B)Perform Quality Assurance
C)Perform Quality Control
D)Project Quality Management
E)Quality Management Plan
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
37
________ is the person most closely associated with the scientific management approach.
A)Eli Whitney
B)Frederic Taylor
C)Walter Shewhart
D)W)Edwards Deming
E)Joseph Juran
A)Eli Whitney
B)Frederic Taylor
C)Walter Shewhart
D)W)Edwards Deming
E)Joseph Juran
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
38
________ provides the basis for continuous improvement by auditing and evaluating the results from quality control measurements so that appropriate quality standards and operational definitions are used.
A)Plan Quality
B)Perform Quality Assurance
C)Perform Quality Control
D)Project Quality Management
E)Quality Management Plan
A)Plan Quality
B)Perform Quality Assurance
C)Perform Quality Control
D)Project Quality Management
E)Quality Management Plan
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
39
Within Six Sigma,the _____ step is to identify the customer satisfaction goals and subgoals.
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
40
Master Black belt is a role in what quality system?
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)None of the above
A)ISO
B)TickIT
C)Six Sigma
D)Capability Maturity Model CMM)
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
41
Verifying that the system satisfies the end customer's scope and detailed requirement specifications is ?
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
42
Testing as a whole in an operating environment to verify functionality and fitness for use is _________ ?
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
43
Within Six Sigma,the _____ step reviews the data for trends,patterns,or relationships.
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
44
Gray box testing is a type of ____________?
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
45
The CMM/CMMI level which is the first to introduce technology change management _________ ?
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
46
What is scientific management? Why was it so popular? Why was it so controversial?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
47
The CMM/CMMI level which documents and standardizes software engineering and management processes throughout the organization is _________ ?
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
48
The CMM/CMMI level which is characterized by the addition of Software Quality management and Quantitative Process Management is _________ ?
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following is a product-oriented activity that attempts to determine if the system or project deliverable meets the customer or client's expectations?
A)Verification
B)Validation
C)Configuration management
D)Fact-based management
E)Software process maturity
A)Verification
B)Validation
C)Configuration management
D)Fact-based management
E)Software process maturity
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
50
Defect arrival rate is an example of a:
A)Process Metric
B)Product Metric
C)Project Metric
D)Project Standard
E)None of the above
A)Process Metric
B)Product Metric
C)Project Metric
D)Project Standard
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
51
Testing whether a set of logically related units work together properly would be done in _________ ?
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
A)Unit testing
B)Integration testing
C)Systems testing
D)Acceptance testing
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
52
Earned Value EV)would be an example of a
A)Process Metric
B)Product Metric
C)Project Metric
D)Project Standard
E)None of the above
A)Process Metric
B)Product Metric
C)Project Metric
D)Project Standard
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
53
The CMM/CMMI level which is the first to introduce key process areas is _________ ?
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
54
Quality metrics should focus on
A)Process
B)Product
C)Project
D)All of the above
E)None of the above
A)Process
B)Product
C)Project
D)All of the above
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
55
The CMM/CMMI level characterized by an immature software organization using ad hoc process is _______ ?
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
A)Level 1 Initial
B)Level 2 Repeatable
C)Level 3 Defined
D)Level 4 Managed
E)Level 5 Optimizing
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
56
Within Six Sigma,during the _____ step process enhancements are proposed and implemented.
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
57
Customer found defects is an example of a:
A)Process Metric
B)Product Metric
C)Project Metric
D)Project Standard
E)None of the above
A)Process Metric
B)Product Metric
C)Project Metric
D)Project Standard
E)None of the above
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
58
Within Six Sigma,the _____ step puts in place methods and tools to maintain performance levels once they have been achieved.
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
A)Define
B)Measure
C)Analyze
D)Improve
E)Control
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
59
Why should quality management include both the products and processes of a project?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
60
What is PQM?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
61
What is a product metric? Give an example.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
62
What is ISO? Why would an organization wish to be ISO certified?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
63
Describe validation.What activities support validation?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
64
What is an Ishikawa diagram? How can it be used as a quality control tool for an IT project?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
65
What is a standard? What role do standards play in developing an information system?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
66
Why did the teachings of Deming and Juran have such an important impact on Japan just after World War II?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
67
What is a control chart? When is a process said to be in statistical control? How would you know if it was not?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
68
What is a process metric? Give an example.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
69
Describe verification.What activities support verification?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
70
What is software process maturity?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
71
What is a Pareto diagram? How can it be used as a quality control tool for an IT project?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck