Exam 10: It Project Quality Management
Exam 1: The Nature of Information Technology Projects56 Questions
Exam 2: Initializing and Conceptualizing the IT Project63 Questions
Exam 3: The Project Infrastructure61 Questions
Exam 4: The Human Side of Project Management53 Questions
Exam 5: Defining and Managing Project and Product Scope49 Questions
Exam 6: The Work Breakdown Structure and Project Estimation66 Questions
Exam 7: The Project Schedule and Budget64 Questions
Exam 8: Managing Project Risk69 Questions
Exam 9: Project Communication,tracking,and Reporting63 Questions
Exam 10: It Project Quality Management71 Questions
Exam 11: Managing Organizational Change, resistance, and Conflict81 Questions
Exam 12: Project Procurement Management and Outsourcing73 Questions
Exam 13: Leadership and Ethics75 Questions
Exam 14: Project Implementation, closure, and Evaluation65 Questions
Select questions type
Control charts are used to highlight statistically significant variation in processes.
Free
(True/False)
4.8/5
(42)
Correct Answer:
True
Validation is a process-oriented activity that focuses on the deployment of specific development procedures.
Free
(True/False)
4.8/5
(37)
Correct Answer:
False
Within Six Sigma,the _____ step reviews the data for trends,patterns,or relationships.
Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
C
Documenting lessons learned is an important part of continuous quality improvement.
(True/False)
4.8/5
(37)
Within Six Sigma,the _____ step is to identify the customer satisfaction goals and subgoals.
(Multiple Choice)
4.9/5
(41)
_____was started by Motorola in the mid-1980's as a basis for measuring the quality of a process rather than the products it produces.
(Multiple Choice)
5.0/5
(28)
________ is determining which quality requirements and/or standards are important for the project and the product and then documenting how compliance will be demonstrated.
(Multiple Choice)
4.8/5
(43)
Verifying that the system satisfies the end customer's scope and detailed requirement specifications is ?
(Multiple Choice)
4.8/5
(31)
The CMM/CMMI level which is the first to introduce technology change management _________ ?
(Multiple Choice)
4.8/5
(40)
What is a control chart? When is a process said to be in statistical control? How would you know if it was not?
(Essay)
4.7/5
(36)
The use of development teams working collaboratively has increased the need for change control and configuration management.
(True/False)
4.9/5
(38)
The CMM/CMMI level which is the first to introduce key process areas is _________ ?
(Multiple Choice)
4.9/5
(42)
A _____ refers to the activities,methods,materials,and measurements used to produce the product or service.
(Multiple Choice)
4.9/5
(32)
Black Belts and Champions are designations of leadership and competence under the Capacity Maturity Model CMM).
(True/False)
4.8/5
(35)
What is an Ishikawa diagram? How can it be used as a quality control tool for an IT project?
(Essay)
4.9/5
(41)
What is scientific management? Why was it so popular? Why was it so controversial?
(Essay)
4.9/5
(37)
In general control limits are set at + or - ________ standard deviations which provides ________ probability limits.
(Multiple Choice)
4.9/5
(46)
________ provides the basis for continuous improvement by auditing and evaluating the results from quality control measurements so that appropriate quality standards and operational definitions are used.
(Multiple Choice)
4.8/5
(36)
Defect arrival rates,Defects by phase,and Fix Response time are all process metrics.
(True/False)
4.8/5
(28)
Showing 1 - 20 of 71
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)