Control charts are used to highlight statistically significant variation in processes.

Free
(True/False)
4.8/5
(42)
Correct Answer:
Verified

True

Validation is a process-oriented activity that focuses on the deployment of specific development procedures.

Free
(True/False)
4.8/5
(37)
Correct Answer:
Verified

False

Within Six Sigma,the _____ step reviews the data for trends,patterns,or relationships.

Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
Verified

C

Documenting lessons learned is an important part of continuous quality improvement.

(True/False)
4.8/5
(37)

Within Six Sigma,the _____ step is to identify the customer satisfaction goals and subgoals.

(Multiple Choice)
4.9/5
(41)

_____was started by Motorola in the mid-1980's as a basis for measuring the quality of a process rather than the products it produces.

(Multiple Choice)
5.0/5
(28)

________ is determining which quality requirements and/or standards are important for the project and the product and then documenting how compliance will be demonstrated.

(Multiple Choice)
4.8/5
(43)

Verifying that the system satisfies the end customer's scope and detailed requirement specifications is ?

(Multiple Choice)
4.8/5
(31)

Earned Value EV)would be an example of a

(Multiple Choice)
4.9/5
(25)

The CMM/CMMI level which is the first to introduce technology change management _________ ?

(Multiple Choice)
4.8/5
(40)

What is a control chart? When is a process said to be in statistical control? How would you know if it was not?

(Essay)
4.7/5
(36)

The use of development teams working collaboratively has increased the need for change control and configuration management.

(True/False)
4.9/5
(38)

The CMM/CMMI level which is the first to introduce key process areas is _________ ?

(Multiple Choice)
4.9/5
(42)

A _____ refers to the activities,methods,materials,and measurements used to produce the product or service.

(Multiple Choice)
4.9/5
(32)

Black Belts and Champions are designations of leadership and competence under the Capacity Maturity Model CMM).

(True/False)
4.8/5
(35)

What is an Ishikawa diagram? How can it be used as a quality control tool for an IT project?

(Essay)
4.9/5
(41)

What is scientific management? Why was it so popular? Why was it so controversial?

(Essay)
4.9/5
(37)

In general control limits are set at + or - ________ standard deviations which provides ________ probability limits.

(Multiple Choice)
4.9/5
(46)

________ provides the basis for continuous improvement by auditing and evaluating the results from quality control measurements so that appropriate quality standards and operational definitions are used.

(Multiple Choice)
4.8/5
(36)

Defect arrival rates,Defects by phase,and Fix Response time are all process metrics.

(True/False)
4.8/5
(28)
Showing 1 - 20 of 71