Exam 1: The Systems Development Environment
Exam 1: The Systems Development Environment100 Questions
Exam 2: The Origins of Software100 Questions
Exam 3: Managing the Information Systems Project97 Questions
Exam 4: Identifying and Selecting Systems Development Projects100 Questions
Exam 5: Initiating and Planning Systems Development Projects98 Questions
Exam 6: Determining System Requirements98 Questions
Exam 7: Structuring System Process Requirements100 Questions
Exam 8: Structuring System Data Requirements96 Questions
Exam 9: Designing Databases100 Questions
Exam 10: Designing Forms and Reports100 Questions
Exam 11: Designing Interfaces and Dialogues99 Questions
Exam 12: Designing Distributed and Internet Systems100 Questions
Exam 13: System Implementation95 Questions
Exam 14: Maintaining Information Systems99 Questions
Select questions type
Under eXtreme Programming,________ and ________ are intimately related parts of the same process.
Free
(Multiple Choice)
4.8/5
(33)
Correct Answer:
C
The critical factor "Personnel" is related to which of the following critical factors in distinguishing agile methods from traditional systems development?
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
C
Which of the following is NOT a part of the Evolutionary model of the SDLC process?
Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
D
Although almost all systems development projects adhere to some type of life cycle,the exact location of activities and the specific sequencing of steps can vary greatly from one project to the next.
(True/False)
4.9/5
(33)
Which of the following is NOT a feature of eXtreme Programming?
(Multiple Choice)
4.7/5
(36)
Which of the following are delivered after the completion of analysis phase?
(Multiple Choice)
4.9/5
(30)
According to Fowler,which of the following is NOT considered a valid individual methodology that comes under the umbrella of Agile Methodologies?
(Multiple Choice)
4.8/5
(33)
Which of the below is a traditional methodology used to develop,maintain,and replace information systems?
(Multiple Choice)
4.9/5
(39)
What is the first phase in the Systems Development Life Cycle?
(Multiple Choice)
4.9/5
(32)
Most organizations find it beneficial to use a standard set of steps,called ________,to develop and support their information systems.
(Multiple Choice)
4.9/5
(37)
Information systems analysis and design is a process to develop and maintain computer-based information systems.
(True/False)
4.9/5
(44)
________ would be classified as software designed to support the payroll function.
(Multiple Choice)
4.8/5
(45)
Maintenance is a separate phase and not the repetition of the other life cycle phases to study and implement the needed changes.
(True/False)
4.8/5
(29)
________ is designed to support organizational functions or processes.
(Multiple Choice)
4.9/5
(37)
Which of the following is the best known Agile development methodology?
(Multiple Choice)
4.8/5
(34)
Under the five critical factors "Thrives in a culture where people feel comfortable and empowered by having many degrees of freedom" is related to which factor?
(Multiple Choice)
4.9/5
(32)
The first procedural,or third-generation,computer programming languages did not become available until the beginning of the ________.
(Multiple Choice)
4.9/5
(42)
In which part of the design phase of the SDLC are the logical specifications of the system from logical design transformed into technology-specific details from which all programming and system construction can be accomplished?
(Multiple Choice)
4.7/5
(34)
Showing 1 - 20 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)