Exam 5: Initiating and Planning Systems Development Projects

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

At what point in the project should you identify the alternative solutions?

Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
Verified

C

Which document outlines all work required to complete the project?

Free
(Multiple Choice)
4.8/5
(46)
Correct Answer:
Verified

C

When projects are across departments with different objectives,it may be difficult to get parties to agree on the direction of the project.

Free
(True/False)
4.9/5
(38)
Correct Answer:
Verified

True

All of the following are categories of feasibility except ________.

(Multiple Choice)
4.8/5
(40)

All of the following are included in the baseline project report except ________.

(Multiple Choice)
4.9/5
(38)

Which of the following is an example of a procurement IS cost?

(Multiple Choice)
4.8/5
(28)

The following is NOT an example of a type of feasibility study.

(Multiple Choice)
4.9/5
(36)

Which of the following is NOT an example of a system description?

(Multiple Choice)
4.8/5
(41)

Which of the following is NOT a question asked to determine if project initiation and planning has ended and analysis has begun?

(Multiple Choice)
4.8/5
(33)

Define tangible and intangible benefits and costs.What is the difference between the two?

(Essay)
4.8/5
(37)

List and describe the sections of the management issues portion of a baseline project report.

(Essay)
4.7/5
(35)

Define legal and contractual feasibility.Describe activities that may be involved in this feasibility study.

(Essay)
4.7/5
(39)

Briefly describe schedule feasibility.Provide an example.

(Essay)
4.9/5
(35)

Which feasibility category deals with identifying financial benefits associated with the project?

(Multiple Choice)
4.8/5
(34)

What are the guidelines for making an effective presentation? Be sure to include the steps in the process.Elaborate on each step.

(Essay)
5.0/5
(27)

Which role in the walkthrough normally has done all or some of the work presented?

(Multiple Choice)
4.9/5
(38)

Briefly define walkthrough and describe the role of each participant.

(Essay)
4.8/5
(34)

An example of a recurring tangible cost is software.

(True/False)
4.8/5
(34)

A project must have a positive ROI to be approved for continuation.

(True/False)
4.8/5
(26)

Which of the following is NOT a guideline for better cost estimation?

(Multiple Choice)
4.7/5
(36)
Showing 1 - 20 of 98