If the scan time is too long,a watchdog error will be declared.

Free
(True/False)
4.9/5
(34)
Correct Answer:
Verified

True

Assume an open in the field wiring is suspected between the output module and output load device.This condition would be confirmed if:

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

A

PLC malfunctions due to electrical noise usually produce temporary occurrences of operating errors.

Free
(True/False)
4.8/5
(37)
Correct Answer:
Verified

True

One of the diagnostic checks carried out by the processor is the proper operation of all I/O devices.

(True/False)
4.9/5
(39)

Which of the following would not normally be located within the PLC enclosure?

(Multiple Choice)
4.9/5
(33)

A good location for a PLC enclosure is close to:

(Multiple Choice)
4.8/5
(35)

The cross reference function allows you to view the transition history of a data table value.

(True/False)
4.8/5
(39)

An enclosure is used to shield the controller from electrical noise and airborne contaminants.

(True/False)
4.9/5
(35)

Which of the choices of the troubleshooting guide shown indicates a problem with the wiring to the output device or the output device itself? Which of the choices of the troubleshooting guide shown indicates a problem with the wiring to the output device or the output device itself?

(Multiple Choice)
4.9/5
(34)

The data monitor feature of a PLC may allow you to:

(Multiple Choice)
4.8/5
(27)

The status indicator on an input module will normally be illuminated if the input device is off and examined for an off condition.

(True/False)
4.8/5
(31)

Electrical noise can be coupled into a PLC system:

(Multiple Choice)
4.8/5
(42)

Communications protocol is a standardized method for establishing communications between different PLC devices.

(True/False)
4.7/5
(39)

Certain input field devices may have a small leakage current when they are:

(Multiple Choice)
4.9/5
(46)

Proper grounding procedures for a PLC installation specify that:

(Multiple Choice)
4.9/5
(32)

Typically,PLC systems installed inside an enclosure can withstand a maximum of:

(Multiple Choice)
4.9/5
(35)

The I/O module input and output status lights:

(Multiple Choice)
4.9/5
(47)

The input wiring or device is suspected as being the source of a PLC problem.If this circuit is not at fault,then the status indicator on the input module should be illuminated when the input device is:

(Multiple Choice)
4.8/5
(33)

The offline programming mode permits the user to change the program during the machine operation.

(True/False)
4.9/5
(25)

A bleeder resistor can be connected to drain off unwanted module leakage current.

(True/False)