Exam 3: Project Management
Exam 1: Systems, Roles, and Development Methodologies74 Questions
Exam 2: Understanding and Modeling Organizational Systems80 Questions
Exam 3: Project Management78 Questions
Exam 4: Information Gathering: Interactive Methods80 Questions
Exam 5: Information Gathering: Unobtrusive Methods80 Questions
Exam 6: Agile Modeling, Prototyping, and Scrum65 Questions
Exam 7: Using Data Flow Diagrams75 Questions
Exam 8: Analyzing Systems Using Data Dictionaries78 Questions
Exam 9: Process Specifications and Structured Decisions78 Questions
Exam 10: Object-Oriented Systems Analysis and Design Using Uml80 Questions
Exam 11: Designing Effective Output75 Questions
Exam 12: Designing Effective Input79 Questions
Exam 13: Designing Databases75 Questions
Exam 14: Human-Computer Interaction and Ux Design78 Questions
Exam 15: Designing Accurate Data Entry Procedures80 Questions
Exam 16: Quality Assurance and Implementation80 Questions
Select questions type
The longest path through a PERT diagram is referred to as the ________ path.
Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
A
List four criteria for evaluating computer hardware for purchase.
Free
(Essay)
4.9/5
(39)
Correct Answer:
1. The time required for average transactions (including how long it takes to input data and how long it takes to receive output)
2. The total volume capacity of the system (how much can be processed at the same time before a problem arises)
3. The idle time of the CPU or network
4. The size of the memory provided
________ is used to determine the point at which the total costs of a current system and a proposed new system are the same.
Free
(Multiple Choice)
4.7/5
(33)
Correct Answer:
C
Systems analysts formulate numbers that represent both current and projected ________ for the system so that any hardware obtained will possess the capability to handle current and future needs.
(Multiple Choice)
4.9/5
(40)
Using a weighted average formula to determine expected activity times is the best strategy for estimating time.
(True/False)
4.8/5
(34)
Changes in employee behavior such as unusually high absenteeism, high job dissatisfaction, or high worker turnover should alert managers to potential problems.
(True/False)
4.7/5
(34)
Which of the following is not an advantage of using a PERT diagram over a Gantt chart?
(Multiple Choice)
4.8/5
(37)
PERT diagrams occasionally need to use dummy activities to preserve the logic.
(True/False)
4.8/5
(36)
Which of the following is not a difference between managing ecommerce projects and the traditional projects?
(Multiple Choice)
4.9/5
(31)
Which of following is not a specific criteria for project selection?
(Multiple Choice)
4.8/5
(35)
An advantage of ________ is that they allow easy identification of the order of precedence and easy determination of slack time.
(Multiple Choice)
5.0/5
(31)
The point at which the total costs of the current system and the proposed system intersect represents the break-even point, the point where it becomes profitable for the business to get the new information system.
(True/False)
4.8/5
(40)
Cloud services are not very scalable. Once you pay for the service, it is hard to upgrade in the future.
(True/False)
4.7/5
(39)
Requirements of a problem definition include the word "not," indicating a limitation.
(True/False)
4.7/5
(41)
Good managers realize that recognizing symptoms of problems is :
(Multiple Choice)
4.8/5
(38)
Which form of analysis would you use to "sell" a systems project to a manager that is only interested in how many widgets will need to be sold before the project becomes profitable? Why?
(Essay)
4.8/5
(36)
Which of the following is not an advantage of using cloud services?
(Multiple Choice)
4.8/5
(37)
Showing 1 - 20 of 78
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)