Exam 27: Lean Principles, Lean Accounting, and Activity Analysis
Exam 1: Introduction to Accounting and Business234 Questions
Exam 2: Analyzing Transactions240 Questions
Exam 3: The Adjusting Process210 Questions
Exam 4: Completing the Accounting Cycle197 Questions
Exam 5: Accounting for Merchandising Businesses233 Questions
Exam 6: Inventories205 Questions
Exam 7: Sarbanes-Oxley, Internal Control, and Cash187 Questions
Exam 8: Receivables196 Questions
Exam 9: Fixed Assets and Intangible Assets226 Questions
Exam 10: Current Liabilities and Payroll194 Questions
Exam 11: Corporations: Organization, Stock Transactions, and Dividends207 Questions
Exam 12: Long-Term Liabilities: Bonds and Notes174 Questions
Exam 13: Investments and Fair Value Accounting167 Questions
Exam 14: Statement of Cash Flows187 Questions
Exam 15: Financial Statement Analysis199 Questions
Exam 16: Managerial Accounting Concepts and Principles202 Questions
Exam 17: Job Order Costing195 Questions
Exam 18: Process Cost Systems198 Questions
Exam 19: Cost Behavior and Cost-Volume-Profit Analysis225 Questions
Exam 20: Variable Costing for Management Analysis160 Questions
Exam 21: Budgeting197 Questions
Exam 22: Performance Evaluation Using Variances From Standard Costs175 Questions
Exam 23: Performance Evaluation for Decentralized Operations217 Questions
Exam 24: Differential Analysis, Product Pricing, and Activity-Based Costing176 Questions
Exam 25: Capital Investment Analysis188 Questions
Exam 26: Cost Allocation and Activity-Based Costing110 Questions
Exam 27: Lean Principles, Lean Accounting, and Activity Analysis137 Questions
Select questions type
Accounting for lean operations requires fewer transactions because
(Multiple Choice)
4.8/5
(46)
Schedule of Activity Costs Quality Control Activities Activity Cost Frocess audits \ 50,000 Training of machine operators 28,000 Frocessing returned products 19,000 Scrap processing disposal) 25,000 Rework 8,000 Freventative maintenance 30,000 Froduct design 46,000 Warranty work 12,000 Finished goods inspection 23,000
-From the above schedule of activity costs, determine the external failure costs.
(Multiple Choice)
4.8/5
(36)
Costs of failing to control quality include prevention costs and external failure costs.
(True/False)
4.8/5
(39)
Conan Electronics Corporation manufactures and assembles electronic motor drives for video cameras. The company assembles the motor drives for several accounts. The process consists of a lean cell for each customer. The following information relates only to one customer's lean cell. For the year, planned labor and overhead was $80,000,000; materials costs, $25 per unit. Planned production included 9,600 hours to produce 76,800 motor drives. Actual production for the month of August was 5,200 units, and motor drives shipped amounted to 5,040 units. From the foregoing information, determine the budgeted cell conversion cost per hour.
(Multiple Choice)
4.8/5
(36)
Which of the following drives work-in-process inventory levels higher?
(Multiple Choice)
4.7/5
(35)
The Bright Lamp Company has budgeted its conversion cost for the small lamp production as $85,000 for 1,300 production hours. Each unit produced by the cell requires 15 minutes of process time. During the month, 3,800 units are manufactured in the cell. The estimated material cost is $18 per unit. Provide the following journal entries.
a) Materials are purchased to produce 4,000 units.
b) Conversion costs are applied to 3,800 units of production. Please round to nearest cent.)c) 3,650 units are placed into finished goods.
(Essay)
4.9/5
(43)
Long setups and large batch sizes result in smaller inventories.
(True/False)
4.7/5
(35)
In a lean environment, the journal entry to record conversion costs would include a debit to the manufacturing overhead control account.
(True/False)
4.9/5
(36)
Identify the following quality control activities as either value-added or non-value-added.
-Finished goods inspection
(Multiple Choice)
4.9/5
(39)
Extreme Wreaths, Inc. makes wreaths in batch sizes of 15 at a time. The cutting & assembly process takes 10 minutes per wreath, and the decorating process time is 7 minutes per wreath. It takes 5 minutes to move the wreaths from the cutting & assembly process to the decorating process.
In a effort to improve the lead time, the company has tried reducing the batch size to 10 units. The new process is as follows: cutting & assembly process - 8 minutes. The decorating process is still 7 minutes per wreath. It takes 5 minutes to move the wreaths from the cutting & assembly process to the decorating process.
a) Compute the value-added, non-value-added, and the total lead time of the wreath process for both the old and the new manufacturing process.
b) Compute the value-added ratio for both the old and new process. Round to the nearest decimal.
(Essay)
4.8/5
(36)
From the foregoing information, determine the amount of the conversion costs charged to Raw and In Process Inventory during August.
(Multiple Choice)
4.7/5
(41)
Push manufacturing is also referred to as make-to-order processing.
(True/False)
4.8/5
(43)
Schedule of Activity Costs Quality Control Activities Activity Cost Product testing \ 55,000 Assessing vendor quality 26,000 Recalls 18,000 Rework 29,000 Scrap disposal 8,000 Product design 30,000 Training machine operators 46,000 Warranty work 12,000 Process audits 22,000
-From the above schedule, calculate the external failure costs.
(Short Answer)
4.9/5
(39)
In a pull manufacturing system, raw materials are released to production based on actual customer orders.
(True/False)
4.7/5
(38)
Schedule of Activity Costs Quality Control Activities Activity Cost Product testing \ 55,000 Assessing vendor quality 26,000 Recalls 18,000 Rework 29,000 Scrap disposal 8,000 Product design 30,000 Training machine operators 46,000 Warranty work 12,000 Process audits 22,000
-A quality control activity analysis indicated the following four activity costs of a hotel.
(Essay)
4.9/5
(40)
In a lean system, indirect labor is traced directly to product cells.
(True/False)
4.8/5
(32)
Lean manufacturing favors organizing work around processes rather than around products.
(True/False)
4.9/5
(40)
Under a lean environment, employees have the responsibility and authority to
(Multiple Choice)
4.7/5
(35)
Showing 81 - 100 of 137
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)