Exam 5: Activity-Based Costing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The first step in activity-based costing is to assign overhead costs to products, using cost drivers.

Free
(True/False)
4.9/5
(43)
Correct Answer:
Verified

False

What sometimes makes implementation of activity-based costing difficult in service industries is

Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
Verified

C

Which of the following is a limitation of activity-based costing?

Free
(Multiple Choice)
4.8/5
(51)
Correct Answer:
Verified

D

Veronica Co.produces 3 products, Products Rain, Snow, and Wind.Product Rain requires 15 machine setups, Product Snow requires 20 setups, and Product Wind requires 35 setups.Veronica has identified an activity cost pool with allocated overhead of $420,000 for which the cost driver is machine setups.How much overhead is assigned to each product? \(\begin{array} {l r r r } \text { Rain } & \text { Snow } & \text { Wind } \\

(Multiple Choice)
4.9/5
(34)

Sleep-Tight manufactures mattresses for the hotel industry.It has two products, Downy and Firm and total overhead of $504,000.The company plans to manufacture 200 Downy mattresses and 300 Firm mattresses this year.In manufacturing the mattresses, the company must perform 700 material moves for the Downy and 300 for the Firm; it processes 114 purchase orders for the Downy and 90 for the Firm; and the company's employees work 2,800 direct labour hours on the Downy product and 3,500 on the Firm.Sleep-Tight's total material handling costs are $300,000 and its total purchasing costs are $204,000. Using ABC, how much overhead would be assigned to the Downy product?

(Multiple Choice)
4.8/5
(39)

Activity-based management focuses on reducing costs and improving processes.

(True/False)
4.8/5
(29)

A cost driver is

(Multiple Choice)
4.8/5
(47)

The presence of any of the following factors would suggest a switch to ABC EXCEPT when

(Multiple Choice)
4.8/5
(36)

Which of the following is a product-level activity?

(Multiple Choice)
4.9/5
(31)

One of Astro Fireworks Company's activity cost pools is machine setups, with estimated overhead of $200,000.Astro produces sparklers (75 setups)and lighters (25 setups).How much of the machine setup cost pool should be assigned to sparklers?

(Multiple Choice)
4.8/5
(29)

The first step in activity-based costing is to

(Multiple Choice)
4.8/5
(29)

A critical component of an activity-based accounting system is

(Multiple Choice)
4.8/5
(32)

Plant management is a batch-level activity.

(True/False)
4.8/5
(39)

Traditional costing systems use multiple predetermined overhead rates.

(True/False)
4.7/5
(35)

Which of the following is an example of a product-level activity in a refinery?

(Multiple Choice)
4.8/5
(37)

Value-added activities

(Multiple Choice)
4.8/5
(33)

Any activity that increases the cost of producing a product is a value-added activity.

(True/False)
4.9/5
(47)

Which of the following is a non-value-added activity?

(Multiple Choice)
4.8/5
(36)

Which of the following is a value-added activity?

(Multiple Choice)
4.8/5
(39)

Which of the following is a unit-level activity?

(Multiple Choice)
4.8/5
(39)
Showing 1 - 20 of 85