What is distribution requirements planning?

Free
(Essay)
4.8/5
(36)
Correct Answer:
Verified

Distribution requirements planning is a system that forecasts when the various demands will be made by the system on central supply. This gives central supply and the factory the opportunity to lan for the goods that will actually be needed and when. It is able to both respond to customer demand and coordinate planning and control.

Given the following actual demands for a 10- week period, calculate the average x- bar of the distribution. Period Actual demand 1 1200 2 1000 3 800 4 900 5 1400 6 1100 7 1100 8 700 9 1000 10 800

Free
(Essay)
4.9/5
(29)
Correct Answer:
Verified

Period Actual demand 11200210003800490051400611007110087009100010800\begin{array} { l l } 1 & 1200 \\2 & 1000 \\3 & 800 \\4 & 900 \\5 & 1400 \\6 & 1100 \\7 & 1100 \\8 & 700 \\9 & 1000 \\10 & 800\end{array} 10,000/10 = 1,000 units

Distribution inventory includes all the finished goods held anywhere in the distribution system.

Free
(True/False)
4.9/5
(36)
Correct Answer:
Verified

True

What is the purpose of safety stock?

(Essay)
4.8/5
(34)

Distribution inventory management systems can be classified as:

(Multiple Choice)
4.8/5
(41)

Permanent or static inventory includes data such as:

(Multiple Choice)
4.8/5
(39)

An inventory record contains variable and permanent information.

(True/False)
4.7/5
(36)

Variable or dynamic information changes with each transaction and includes:

(Multiple Choice)
4.9/5
(33)

Materials requirements planning is a system that forecasts when the various demands will be mady by the system on central supply.

(True/False)
4.9/5
(34)

The decentralized system is sometimes called the pull system because orders are placed on central supply and "pulled" through the system.

(True/False)
4.9/5
(42)

Why do stickouts cost money?

(Short Answer)
4.9/5
(35)

The purpose of holding inventory in distribution centers is to improve customer service by locating stock away from the customer and to increase transportation costs.

(True/False)
4.9/5
(42)

In the order point system, an order is placed when:

(Multiple Choice)
4.8/5
(40)

The kanban system is a simply system that signals the need for less product.

(True/False)
4.7/5
(41)

Unless a firm delivery directory from factory to customer demand n the factory is created by central supply.

(True/False)
4.9/5
(47)

In a centralized system, each distribution center first determines what it needs and when, and then places orders in central supply.

(True/False)
4.9/5
(26)

The forecast interval is 4 weeks and the lead time interval is 2 weeks. Sigma for the forecast interval is 150 units. Calculate the standard deviation for the lead time interval.

(Short Answer)
4.7/5
(42)

Planned order releases from the various distribution centers become the ________to the material plan of central supply in DRP.

(Multiple Choice)
4.9/5
(43)

The advantage of the decentralized system is that each center can operate on its own and thus reduce communication and coordination expense.

(True/False)
4.9/5
(38)

In a centralized system:

(Multiple Choice)
5.0/5
(45)