____________________ is the desired or minimum number of queries and transactions that must be processed per minute or hour.

Free
(Short Answer)
4.9/5
(27)
Correct Answer:
Verified

Throughput

Often the deployment of a new system will require training.What groups typically may require training?

Free
(Multiple Choice)
4.9/5
(43)
Correct Answer:
Verified

C

____________________ is the desired or maximum allowable time limit for software response to a query or update.

Free
(Short Answer)
4.8/5
(25)
Correct Answer:
Verified

Response time
Response

Partial parallel deployment and operation always entails the risk that significant errors or problems will go undetected.

(True/False)
4.8/5
(43)

Under which of the following circumstances might a direct deployment be a good choice?

(Multiple Choice)
5.0/5
(39)

An type of integration test that tests an entire subsystem or an entire system is called a(n)_______ test.

(Short Answer)
4.9/5
(35)

The primary disadvantage of ____ deployment is increased complexity.

(Multiple Choice)
4.9/5
(40)

List and briefly describe three ways to deploy a new system.

(Essay)
4.9/5
(40)

A(n)____ version is a system that is stable enough to be tested by end users.

(Multiple Choice)
4.7/5
(37)

A(n)____ version is a system version created for long-term release to users.

(Multiple Choice)
5.0/5
(33)

________ deployment is most useful when a system is large,complex,and composed of relatively independent subsystems.

(Short Answer)
4.7/5
(35)

Which is NOT a responsibility of a test driver?

(Multiple Choice)
4.8/5
(30)

Frequently customer payments for new systems are tied to specific acceptance tests.

(True/False)
4.8/5
(25)

Stubs are needed for ____________________ development.

(Short Answer)
4.8/5
(43)

Testing and construction should be done independently of each other.

(True/False)
4.9/5
(25)

List and briefly describe the six activities of Core Process 6: Complete system tests and deploy the solution,i.e.Deployment activities.

(Essay)
4.9/5
(29)

____________________ tests are valuable because they provide rapid feedback regarding significant problems.

(Short Answer)
4.8/5
(41)

In a ____ deployment,the system is installed and brought into operation in a series of steps.

(Multiple Choice)
4.7/5
(33)

A maintenance change typically skims or skips the ____ activities of the system development life cycle (SDLC).

(Multiple Choice)
4.8/5
(32)

Most organizations use a(n)____ form to propose and document a maintenance change.

(Multiple Choice)
4.8/5
(45)