Exam 27: Urban Search and Rescue

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Response teams must be able to deploy quickly and then be self-sufficient for up to ____.

Free
(Multiple Choice)
4.9/5
(41)
Correct Answer:
Verified

A

During an emergency search and rescue, physicians serve as ____, coordinating the entire medical response including physicians assistants, nurses, and paramedics.

Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
Verified

C

____ is the search for deceased patients.

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

A

Crushing force means pressure sufficient to cause muscle damage.

(True/False)
4.8/5
(35)

A(n) ____ occurs when a team is being sent to the scene of a disaster for a search and rescue mission.

(Multiple Choice)
4.9/5
(37)

____ use specialized computer equipment, microphones, listening devices, fiberoptic cameras, and vibration detectors to search for and locate entrapped patients.

(Multiple Choice)
4.8/5
(34)

USAR team positions are filled by application.

(True/False)
4.8/5
(40)

____ construction structures are designed to withstand shear forces typical of earthquakes and heavy winds.

(Multiple Choice)
4.9/5
(34)

A(n) ____ is issued to notify the system that there is an emerging or potential incident.

(Multiple Choice)
4.7/5
(29)

There are four Paramedics on each medical response team.

(True/False)
4.8/5
(28)

A ____ response deploys a team of 28 personnel, two canines, and a limited equipment cache.

(Multiple Choice)
4.8/5
(42)

Incident support teams (ISTs) are ____ teams of highly qualified specialists.

(Multiple Choice)
4.8/5
(34)

Structural engineers are involved with the ongoing rescue efforts, particularly with ensuring safe movement of debris.

(True/False)
4.9/5
(42)

The ____ team is comprised of the following specialists: hazardous materials, structural, and heavy equipment and rigging.

(Multiple Choice)
4.8/5
(42)

____ of a rescue refers to the onset of the incident.

(Multiple Choice)
4.9/5
(41)

The goal of forced diuresis is urine output of 400 mL\hr.

(True/False)
4.9/5
(38)

____construction structures are built to withstand vertical load forces.

(Multiple Choice)
4.9/5
(36)

USAR teams respond in an all-hazards manner.

(True/False)
4.7/5
(34)

A(n) ____ is issued when activation is expected.

(Multiple Choice)
4.7/5
(28)

There are five incident support teams nationally, and each is on call for emergency response every fifth month.

(True/False)
4.9/5
(40)
Showing 1 - 20 of 30
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)