Exam 27: Floor Systems and Foundation Support
Exam 1: Professional Architectural Careers15 Questions
Exam 2: Exploring Residential Design and Professional Office Practice15 Questions
Exam 3: Preparing for Success15 Questions
Exam 4: Computer-Aided Design in Architecture15 Questions
Exam 5: Guidelines and Codes That Affect Design15 Questions
Exam 6: Interior Design Considerations15 Questions
Exam 7: Exterior Design Factors and Styles15 Questions
Exam 8: Environmental Design Considerations15 Questions
Exam 9: Land Descriptions and Drawings15 Questions
Exam 10: Site-Related Drawing Layout15 Questions
Exam 11: Floor Plans - Symbols, Annotation, and Dimensions15 Questions
Exam 12: Completing a Floor Plan With Cad15 Questions
Exam 13: Electrical Plans15 Questions
Exam 14: Plumbing Systems15 Questions
Exam 15: Comfort Control Systems15 Questions
Exam 16: Roof Plan Components15 Questions
Exam 17: Roof Plan Layout With Cad15 Questions
Exam 18: Introduction to Elevations15 Questions
Exam 19: Elevation Layout and Cad Drawing Techniques15 Questions
Exam 20: Representing Interior Finishing Materials and Cabinets With Cad15 Questions
Exam 21: Framing Methods15 Questions
Exam 22: Structural Components15 Questions
Exam 23: Design Criteria for Structural Loading15 Questions
Exam 24: Sizing Joists, Rafters, and Beams15 Questions
Exam 25: Drawing Framing Plans15 Questions
Exam 26: Foundation Systems15 Questions
Exam 27: Floor Systems and Foundation Support15 Questions
Exam 28: Foundation Plan Layout15 Questions
Exam 29: Sectioning Basics15 Questions
Exam 30: Section Layout15 Questions
Exam 31: Stair Construction and Layout15 Questions
Exam 32: Fireplace Construction and Layout15 Questions
Exam 33: Construction Documentation, Specifications, and Project Manuals15 Questions
Exam 34: Presentation Drawings15 Questions
Exam 35: Renovations, Remodeling, and Additions15 Questions
Select questions type
The crawl space is the area formed between the floor system and the ground.
Free
(True/False)
4.9/5
(38)
Correct Answer:
True
Which of these components should be specified by note only?
Free
(Multiple Choice)
4.9/5
(37)
Correct Answer:
A
A ____ is a horizontal load-bearing member that spans between two or more supports at the foundation level.
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
C
A _____ is used to provide support for floor joists and the subfloor when they intersect the concrete.
(Multiple Choice)
4.8/5
(30)
When concrete construction must be interrupted, a ____is used to provide a clean surface where work can be resumed.
(Multiple Choice)
4.8/5
(36)
Concrete slabs can often be poured over unstable soil by using a method of reinforcement known as ____.
(Multiple Choice)
4.8/5
(31)
A concrete slab is often used for the floor system of residences in warm, dry climates.
(True/False)
4.8/5
(30)
Which of these are used to span between the foundation walls?
(Multiple Choice)
4.9/5
(46)
The floor slab can be poured as an extension of the foundation wall and footing, in what is referred to as monolithic construction.
(True/False)
4.8/5
(39)
Friction between the slab and the soil causes cracking, which can be controlled by a(n) ____.
(Multiple Choice)
4.9/5
(30)
Which of these components should be shown on a slab foundation plan?
(Multiple Choice)
4.9/5
(37)
When a municipality requires a concrete slab to be insulated to prevent heat loss, the insulation must always be placed on top of the slab.
(True/False)
4.8/5
(45)
The post-and-beam floor system is a popular floor framing choice for _____.
(Multiple Choice)
4.8/5
(27)
When a slab is placed on more than 4" (100 mm) of uncompacted fill, _____ should be specified to help the slab resist cracking.
(Multiple Choice)
4.7/5
(33)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)