Exam 20: Organizing a Drawing Sheet
Exam 1: Review of Basic Mathematical Procedures15 Questions
Exam 2: Safety12 Questions
Exam 3: Linear Measurements10 Questions
Exam 4: Angular Measurements10 Questions
Exam 5: Learning to Use the Architects Scale10 Questions
Exam 6: Learning to Use the Engineers Scale10 Questions
Exam 7: Symbols and Abbreviations10 Questions
Exam 8: How Working Drawings Are Created10 Questions
Exam 9: Categories of Working Drawings10 Questions
Exam 10: Sections, Elevations and Details15 Questions
Exam 11: Creating Construction Drawings15 Questions
Exam 12: Who Uses Construction Drawings10 Questions
Exam 13: Specifications15 Questions
Exam 14: Title Blocks15 Questions
Exam 15: Types and Weights of Lines15 Questions
Exam 16: Orthographic Projection15 Questions
Exam 17: Oblique Drawings15 Questions
Exam 18: Isometric Drawings15 Questions
Exam 19: Lettering and Notations10 Questions
Exam 20: Organizing a Drawing Sheet10 Questions
Exam 21: Shading and Crosshatching10 Questions
Exam 22: Drawing Construction Elevations15 Questions
Exam 23: Drawing Construction Details10 Questions
Exam 24: Freehand Sketching15 Questions
Exam 25: Drafting With Instruments15 Questions
Exam 26: Reading Architectural Plans10 Questions
Exam 27: Ductwork Plans15 Questions
Exam 28: Reading Mechanical Plans10 Questions
Exam 29: Reading Electrical Plans10 Questions
Exam 30: Reading Plumbing Plans10 Questions
Exam 31: Current Technology15 Questions
Exam 32: Introduction to Load Calculations15 Questions
Select questions type
The designer and drafter are responsible for relaying information to the technician in a ________, _________, and ___________ mannor.
Free
(Short Answer)
4.8/5
(42)
Correct Answer:
thorough, net, and prderly
A completion log keeps customers informed as to what percentage of the drawings on each sheet has been finished.
Free
(True/False)
4.8/5
(34)
Correct Answer:
False
The last group of plans are the _________.
Free
(Short Answer)
4.8/5
(33)
Correct Answer:
schedules
A popular sysem for organizing plans for a project used an ______________ sheet of paper to represent each sheet.
(Multiple Choice)
5.0/5
(39)
The size of the job determines the number of sheets of drawings that will be required.
(True/False)
4.9/5
(41)
The most imprortant thing to remember in planning a drawing sheet is that the sheet must be _____________.
(Short Answer)
4.8/5
(44)
In larger offices, ech designer may be assigned a certain ________ to complete.
(Short Answer)
4.8/5
(39)
Cluttered and unorganized sheets are hard to read and may cause costly mistakes.
(True/False)
4.7/5
(36)