Exam 25: Drafting With Instruments
Exam 1: Review of Basic Mathematical Procedures15 Questions
Exam 2: Safety12 Questions
Exam 3: Linear Measurements10 Questions
Exam 4: Angular Measurements10 Questions
Exam 5: Learning to Use the Architects Scale10 Questions
Exam 6: Learning to Use the Engineers Scale10 Questions
Exam 7: Symbols and Abbreviations10 Questions
Exam 8: How Working Drawings Are Created10 Questions
Exam 9: Categories of Working Drawings10 Questions
Exam 10: Sections, Elevations and Details15 Questions
Exam 11: Creating Construction Drawings15 Questions
Exam 12: Who Uses Construction Drawings10 Questions
Exam 13: Specifications15 Questions
Exam 14: Title Blocks15 Questions
Exam 15: Types and Weights of Lines15 Questions
Exam 16: Orthographic Projection15 Questions
Exam 17: Oblique Drawings15 Questions
Exam 18: Isometric Drawings15 Questions
Exam 19: Lettering and Notations10 Questions
Exam 20: Organizing a Drawing Sheet10 Questions
Exam 21: Shading and Crosshatching10 Questions
Exam 22: Drawing Construction Elevations15 Questions
Exam 23: Drawing Construction Details10 Questions
Exam 24: Freehand Sketching15 Questions
Exam 25: Drafting With Instruments15 Questions
Exam 26: Reading Architectural Plans10 Questions
Exam 27: Ductwork Plans15 Questions
Exam 28: Reading Mechanical Plans10 Questions
Exam 29: Reading Electrical Plans10 Questions
Exam 30: Reading Plumbing Plans10 Questions
Exam 31: Current Technology15 Questions
Exam 32: Introduction to Load Calculations15 Questions
Select questions type
The compass is used to draw __________.
Free
(Multiple Choice)
4.7/5
(31)
Correct Answer:
A
Lettering guides are used to draw guidelines so that letters will not have the same height
Free
(True/False)
4.8/5
(35)
Correct Answer:
False
Arcs should have definite __________ and ___________ points.
Free
(Short Answer)
4.8/5
(40)
Correct Answer:
starting and ending
For the successful complection of any project drafters are constantly concerne with three factors: _________, _____________, & ___________.
(Short Answer)
5.0/5
(47)
The ductwork elbow is one of the most common fittings used in a duct system.
(True/False)
4.9/5
(35)
The sucess or failure of a building construction project can often be determined by the quality of the construction plans.
(True/False)
4.8/5
(29)
The architectural scale is used to __________ the size of a drawing.
(Short Answer)
4.7/5
(34)
Years ago, all woring drawings were produced using drawing boards and __________.
(Short Answer)
4.8/5
(39)
The short radius on the inside of the duct ell is called the __________.