Exam 11: Practical Applications of Public Health Emergency Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What member of the ICS command group will approve of all materials that are to be released by the response or briefed to the public or media?

Free
(Multiple Choice)
4.9/5
(45)
Correct Answer:
Verified

B

The Logistics Section is responsible for directing and coordinating all of the actual operations within the response.

Free
(True/False)
4.8/5
(40)
Correct Answer:
Verified

False

All that is needed for an ICS to be activated is an incident commander.

Free
(True/False)
4.9/5
(38)
Correct Answer:
Verified

True

If something happens during an event, it can then become an incident.

(True/False)
4.8/5
(37)

The major units of what section of the General Staff of the ICS are the Resources Unit, the Situation Unit, the Demobilization Unit, the Documentation Unit, and the Technical Specialists?

(Multiple Choice)
4.8/5
(33)

Which of the following refers to something we can plan for in advance?

(Multiple Choice)
4.8/5
(36)

The basic ICS structure contains a command group and a general staff group.

(True/False)
4.8/5
(39)

The Incident Command System (ICS) is a standardized system that can be used in any type of disaster.

(True/False)
4.8/5
(33)

The Fogging Operations unit will work with what Section to determine the best areas for street routing for foggers in the potentially affected area?

(Multiple Choice)
4.8/5
(34)

Span of control means that there are usually three to seven persons working for one supervisor.

(True/False)
4.7/5
(42)

The idea behind the ICS is that the system is expandable or contractible based on the needs of the response.

(True/False)
4.9/5
(32)

The Resources Unit not only tracks personnel, but also tracks all of the equipment used during the response.

(True/False)
4.8/5
(33)

The Fogging Operations Unit should be activated if which of the following is unable to be treated or eliminated after a disaster?

(Multiple Choice)
4.8/5
(37)

Principals from what system would later become the ICS?

(Multiple Choice)
4.9/5
(33)

Human-caused disasters can include a biological, chemical, radiological, or nuclear attack.

(True/False)
4.8/5
(35)

When an objective of the response is met, what unit begins assessing whether resources can be sent home?

(Multiple Choice)
4.7/5
(43)

All community partners should be involved in the determination of threats and hazards.

(True/False)
4.8/5
(36)

Usually, the Logistics Section is the first section activated and to have assets assigned to the response.

(True/False)
4.9/5
(45)

An event is something that happens that requires us to respond, whereas an incident is something we plan for in advance.

(True/False)
4.7/5
(40)

Which of the following serves as a conduit of information between agencies or organizations supporting the response?

(Multiple Choice)
4.8/5
(40)
Showing 1 - 20 of 29
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)