Exam 5: Use Case Modeling
Exam 1: From Beginning to End: An Overview of Systems Analysis and Design72 Questions
Exam 2: Investigating System Requirements90 Questions
Exam 3: Identifying User Stories and Use Cases82 Questions
Exam 4: Domain Modeling90 Questions
Exam 5: Use Case Modeling80 Questions
Exam 6: Foundations for Systems Design80 Questions
Exam 7: Defining the System Architecture86 Questions
Exam 8: Designing the User Interface86 Questions
Exam 9: Designing the Database96 Questions
Exam 10: Approaches to System Development82 Questions
Exam 11: Project Planning and Project Management82 Questions
Exam 12: Object-Oriented Design: Fundamentals89 Questions
Exam 13: Object-Oriented Design: Use Case Realization93 Questions
Exam 14: Deploying the New System88 Questions
Exam 15: The Role of the Systems Analyst50 Questions
Exam 16: The Traditional Approach to Requirements50 Questions
Exam 17: Project Management Techniques56 Questions
Select questions type
In a system sequence diagram the order of the messages is determined by numbering the messages.
(True/False)
4.8/5
(24)
On an activity diagram,the diamond represents an "AND" condition.
(True/False)
4.8/5
(39)
In UML terminology in a sequence diagram,a message refers to a(n)_______.
(Multiple Choice)
4.8/5
(47)
In a sequence diagram the syntax of a message is given by the following: [A] B := C (D)The letter B represents what?
(Multiple Choice)
4.8/5
(32)
A technique that is used to validate the set of use cases against identified classes is called __________ technique.
(Short Answer)
4.8/5
(30)
In a fully developed use case description the exception conditions represent what?
(Multiple Choice)
4.8/5
(29)
In an activity diagram,a separate use case may used as part of the workflow.
(True/False)
4.7/5
(36)
On an activity diagram,what are the vertical rectangles that contain the activity ovals called?
(Short Answer)
4.9/5
(41)
Identify the elements of the message syntax for a message on an SSD.
(Essay)
4.9/5
(43)
In a sequence diagram,a message is considered to be an action that is invoked on the destination object.
(True/False)
5.0/5
(39)
In the object-oriented approach to systems development,the flow of information is achieved by sending messages either to and from actors or back and forth between internal objects.
(True/False)
4.9/5
(40)
Since an activity diagram is not object-oriented (e.g.no objects),it is not a standard model of the object-oriented Unified Modeling Language (UML).
(True/False)
4.8/5
(44)
In a sequence diagram a horizontal dashed line represents what?
(Multiple Choice)
4.8/5
(39)
A good way to ensure that all the use cases have been identified is through _______________.
(Multiple Choice)
4.7/5
(37)
In a sequence diagram the syntax of a message is given by the following:
[A] B := C (D) The letter D represents what?
(Short Answer)
4.9/5
(33)
In an interaction diagram,messages are sent and received by individual objects,not by classes.
(True/False)
4.9/5
(41)
Showing 41 - 60 of 80
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)