Exam 14: Deploying the New System
Exam 1: From Beginning to End: An Overview of Systems Analysis and Design72 Questions
Exam 2: Investigating System Requirements90 Questions
Exam 3: Identifying User Stories and Use Cases82 Questions
Exam 4: Domain Modeling90 Questions
Exam 5: Use Case Modeling80 Questions
Exam 6: Foundations for Systems Design80 Questions
Exam 7: Defining the System Architecture86 Questions
Exam 8: Designing the User Interface86 Questions
Exam 9: Designing the Database96 Questions
Exam 10: Approaches to System Development82 Questions
Exam 11: Project Planning and Project Management82 Questions
Exam 12: Object-Oriented Design: Fundamentals89 Questions
Exam 13: Object-Oriented Design: Use Case Realization93 Questions
Exam 14: Deploying the New System88 Questions
Exam 15: The Role of the Systems Analyst50 Questions
Exam 16: The Traditional Approach to Requirements50 Questions
Exam 17: Project Management Techniques56 Questions
Select questions type
Identify and briefly describe the six procedures that must be put in place to begin integration testing.
(Essay)
4.9/5
(38)
A test of an individual method or even a class in isolation from the rest of the system is called ______ ______.
(Short Answer)
4.9/5
(46)
Frequently customer payments for new systems are tied to specific acceptance tests.
(True/False)
4.8/5
(40)
Due to design principles for object-oriented systems,such as cohesion and coupling,integration testing is usually a straightforward process with little complexity.
(True/False)
4.8/5
(36)
A good unit test is thorough and is usually required only once.
(True/False)
4.8/5
(42)
The primary purpose and benefit of a build and smoke test is to _______ .
(Multiple Choice)
5.0/5
(33)
A type of integration test that determines whether a system or subsystem can meet time-based throughput criteria is called a(n)_______ _______ .
(Short Answer)
4.9/5
(26)
A method or class developed for unit testing that simulates the execution of the method or class that has not been written yet is called a(n)_____.
(Short Answer)
4.9/5
(38)
Which is NOT one of the primary characteristic of unit testing:
(Multiple Choice)
4.8/5
(38)
A system development based on selecting specific use cases to be developed first,might be called ______ _____ ______ _____.
(Short Answer)
4.8/5
(42)
An type of integration test that tests an entire subsystem or an entire system is called a(n)_______ _______.
(Short Answer)
4.8/5
(32)
A(n)____ version is a system that is incomplete but ready for some level of rigorous testing.
(Multiple Choice)
4.9/5
(39)
If one class calls a method in another class,but uses the wrong API method names,this is would be an error that would first be identified by what kind of test?
(Multiple Choice)
5.0/5
(41)
Describing program functions required to implement specific business procedures is an example of user documentation.
(True/False)
5.0/5
(30)
A(n)____ version is a system version created for long-term release to users.
(Multiple Choice)
4.9/5
(33)
Each use case specification should have test cases identified which can be used for UAT.
(True/False)
4.7/5
(35)
____________________ is the desired or minimum number of queries and transactions that must be processed per minute or hour.
(Short Answer)
4.9/5
(36)
The primary advantage of ____ deployment is its simplicity.
(Multiple Choice)
5.0/5
(42)
A(n)_______ is an automated tool for tracking source code files and controlling changes to those files.
(Short Answer)
4.8/5
(35)
Showing 41 - 60 of 88
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)