Exam 7: Structuring System Process Requirements
Exam 1: The Systems Development Environment155 Questions
Exam 2: The Origins of Software124 Questions
Exam 3: Managing the Information Systems Project159 Questions
Exam 4: Identifying and Selecting Systems Development Projects139 Questions
Exam 5: Initiating and Planning Systems Development Projects134 Questions
Exam 6: Determining System Requirements133 Questions
Exam 7: Structuring System Process Requirements182 Questions
Exam 8: Structuring System Data Requirements122 Questions
Exam 9: Designing Databases134 Questions
Exam 10: Designing Forms and Reports135 Questions
Exam 11: Designing Interfaces and Dialogues134 Questions
Exam 12: Designing Distributed and Internet Systems135 Questions
Exam 13: System Implementation130 Questions
Exam 14: Maintaining Information Systems136 Questions
Exam 15: Object-Oriented Analysis and Design: Use Cases38 Questions
Exam 16: Object-Oriented Analysis and Design: Activity Diagrams9 Questions
Exam 17: Object-Oriented Analysis and Design: Sequence Diagrams30 Questions
Exam 18: Business Process Modeling20 Questions
Exam 19: Objected-Oriented Analysis and Design: Object Modeling-Class Diagrams27 Questions
Select questions type
Having a level-1 diagram with no level-0 diagram is an example of a:
(Multiple Choice)
4.9/5
(38)
A ________ is a data flow diagram of the scope of an organizational system that shows the system boundaries,external entities that interact with a system,and the major information flows between entities and the system.
(Short Answer)
4.7/5
(39)
The principle of balancing and the goal of keeping a DFD as simple as possible led to four additional,advanced rules for drawing DFDs.
(True/False)
4.8/5
(31)
Student data contained on an enrollment form is represented on a data flow diagram as a:
(Multiple Choice)
4.9/5
(39)
A gross violation of DFD consistency would be a level-1 diagram with no level-0 diagram.
(True/False)
4.9/5
(31)
The part of a decision table that lists the actions that result for a given set of conditions is called:
(Multiple Choice)
4.8/5
(38)
A ________ is a DFD that is the result of n nested decomposition of a series of subprocesses from a process on a level-0 diagram.
(Short Answer)
4.9/5
(38)
Completeness,consistency,timing,iterative development,and primitive DFDs are guidelines for drawing DFDs.
(True/False)
4.9/5
(29)
A DFD that is the result of n nested decompositions from a process on a level-0 diagram,is called:
(Multiple Choice)
4.8/5
(44)
Identify the five basic procedures to follow when constructing a decision table.
(Essay)
4.8/5
(31)
Which of the following is a true statement regarding data flows?
(Multiple Choice)
4.8/5
(34)
Assume condition one has three values,condition two has four values,and condition three has two values;the number of rules required for the decision table is nine.
(True/False)
4.9/5
(39)
Assume the first condition has two values;the second condition has two values;the third condition has three values.How many rules will there be?
(Multiple Choice)
4.9/5
(40)
The work or actions performed on data so that they are transformed,stored,or distributed defines:
(Multiple Choice)
4.8/5
(42)
DFD cohesion means your DFDs include all of the necessary components for the system you are modeling.
(True/False)
4.8/5
(27)
Showing 41 - 60 of 182
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)