Exam 10: Building Successful Information Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In _____ of the implementation phase of the systems development life cycle (SDLC), the old and new systems run simultaneously for a short time to ensure the new system works correctly.

Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
Verified

A

In the extreme programming environment, _____ allows programmers to detect and correct programming mistakes as they go, which is faster than correcting them after an entire program has been written. ​

Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
Verified

B

Which of the following is a disadvantage of a request for proposal (RFP)?

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

A

In _____ of the implementation phase of the systems development life cycle (SDLC), an old system is stopped and a new system is implemented.

(Multiple Choice)
4.8/5
(26)

Describe the concept of crowdsourcing.

(Essay)
4.8/5
(38)

Explain how the models created during the analysis phase contribute to the design phase of the systems development life cycle (SDLC).

(Essay)
4.9/5
(33)

Which of the following statements is true of extreme programming (XP)?

(Multiple Choice)
4.8/5
(40)

With the _____ approach, an organization chooses an outsourcing company in any part of the world, as long as it can provide the needed services.

(Multiple Choice)
4.8/5
(37)

Which of the following is a key feature of extreme programming (XP)?

(Multiple Choice)
4.8/5
(42)

In _____ of the implementation phase of the systems development life cycle (SDLC), an analyst introduces an information system in only a limited area of an organization, such as a division or department.

(Multiple Choice)
4.8/5
(33)

The systems development life cycle (SDLC) is also known as the _____.

(Multiple Choice)
4.9/5
(32)

_____ uses an iterative process that repeats the design, development, and testing steps as needed, based on feedback from users.

(Multiple Choice)
4.7/5
(42)

In the context of prototyping during the design phase of the systems development life cycle (SDLC), a _____ shows users how a particular task that was not technically feasible or appears to be unfeasible can be done.

(Multiple Choice)
4.9/5
(28)

One shortcoming of rapid application development (RAD) is _____.

(Multiple Choice)
4.8/5
(26)

The creation of a system specifications document indicates the beginning of the analysis phase of the systems development life cycle (SDLC).

(True/False)
4.9/5
(35)

Describe how information systems are implemented using a plunge conversion method.

(Essay)
4.8/5
(37)

Creating a help desk to support users is an important task in the implementation phase of the systems development life cycle (SDLC).

(True/False)
4.9/5
(30)

The fundamental principle behind _____ is that the self-contained blocks of codes can be reused in a variety of different applications, allowing new business processes to be created from a pool of existing services. ​

(Multiple Choice)
4.7/5
(29)

Describe the advantages of prototypes.

(Essay)
4.9/5
(37)

Which of the following statements is true of pair programming?

(Multiple Choice)
4.8/5
(29)
Showing 1 - 20 of 105
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)