Number of interrelated activities can be organized in different ways are called ______.

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
Verified

D

_______ is a collection of projects that all contribute to the same overall organizational goals.

Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
Verified

C

The relationship between program design and program specification can be portrayed in _________.

Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
Verified

B

The products handed over to the clients at the end of projects are called as _____________.

(Multiple Choice)
4.8/5
(29)

_________ standards should be in place to ensure that changes to requirements are implemented in a safe and orderly way.

(Multiple Choice)
4.8/5
(44)

Projects are __________ by definition and therefore more uncertain than normal undertakings.

(Multiple Choice)
4.9/5
(34)

The costs that include the salaries and other employment costs of the staff involved in the project development and all associated costs are called____________.

(Multiple Choice)
4.8/5
(30)

Project planning is an _________ process.

(Multiple Choice)
4.9/5
(31)

The first phase of waterfall model is ____________.

(Multiple Choice)
4.8/5
(33)

The organization as part of its monitoring and control policy may have a ________in place which dictates that certain statistics have to be collected at various stages of aproject.

(Multiple Choice)
4.7/5
(36)

The alternate name for Waterfall model is _________.

(Multiple Choice)
4.8/5
(28)

The standard way of evaluating the economic benefits of any projects is to carry out a ________ analysis.

(Multiple Choice)
4.8/5
(36)

The calculation of __________ is a project evaluation technique that takes into account the profitability of a project and the timing of cash flows that are produced.

(Multiple Choice)
4.8/5
(30)

Longer term benefits that are considered very difficult to quantify are called _______ .

(Multiple Choice)
5.0/5
(37)

____________ will indicate when expenditure and income will take place.

(Multiple Choice)
4.8/5
(35)

________ is called as a planned activity.

(Multiple Choice)
4.9/5
(43)

In product-driven projects, the objectives of the project are defined in terms of ___________.

(Multiple Choice)
4.9/5
(47)

_________ time is the time between start and end of a task.

(Multiple Choice)
4.7/5
(35)

__________ is record of how much the organization is willing to spend on the system.

(Multiple Choice)
4.9/5
(35)

------------- project interfaces with the organization.

(Multiple Choice)
4.9/5
(35)
Showing 1 - 20 of 23
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)