Exam 4: Linear Programming and Project Management
Exam 1: Linear Programming and Decision-Making Techniques18 Questions
Exam 2: Markov Analysis, Queuing Theory, Operations Research and Mathematical Modeling15 Questions
Exam 3: Simulation Modeling and Analysis9 Questions
Exam 4: Linear Programming and Project Management18 Questions
Exam 5: Linear Programming Models and Techniques8 Questions
Exam 6: LP and Transportation Models: Assumptions, Limitations, and Solutions8 Questions
Exam 7: Queuing Systems20 Questions
Exam 8: Markov Analysis and Simulation Techniques for Queuing Systems31 Questions
Select questions type
While solving LP problem graphically, the area bounded by the constraints is called
Free
(Multiple Choice)
4.9/5
(42)
Correct Answer:
A
Activities lying on the critical path are called………….
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
C
Activities that cannot be started until one or more of the other activities are completed, but immediately succeed them are called ……activities
Free
(Multiple Choice)
4.9/5
(31)
Correct Answer:
B
If two constraints do not intersect in the positive quadrant of the graph, then
(Multiple Choice)
4.9/5
(38)
Which of the following may not be in a linear programming formulation?
(Multiple Choice)
4.9/5
(43)
………. . models in which the input and output variables follow a probability distribution.
(Multiple Choice)
4.9/5
(31)
An activity which must be completed before one or more other activities start is known as ………. activity.
(Multiple Choice)
4.8/5
(41)
While solving an LP problem, infeasibility may be removed by
(Multiple Choice)
4.9/5
(38)
Any activity which does not consume either any resource or time is called ………. . activity.
(Multiple Choice)
4.9/5
(36)
In linear programming problem if all constraints are less than or equal to, then the feasible region is
(Multiple Choice)
4.7/5
(41)
……. is a series of related activities which result in some product or services.
(Multiple Choice)
4.7/5
(32)
Straight lines shown in a linear programming graph indicates
(Multiple Choice)
4.8/5
(32)
…. ……. . is that sequence of activities which determines the total project time.
(Multiple Choice)
4.9/5
(33)
An event which represents the beginning of more than one activity is known as ………. . event.
(Multiple Choice)
4.8/5
(34)