Exam 3: Structures, Equipment, and Materials Used in Construction
Exam 1: Construction and Costing Projects24 Questions
Exam 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow25 Questions
Exam 3: Structures, Equipment, and Materials Used in Construction25 Questions
Exam 4: Construction and Software Development Project Management20 Questions
Exam 5: Construction Techniques, Reports, and Cyber Crimes25 Questions
Exam 6: Cyber-Crimes, Quotations, Tenders, and Contract Law24 Questions
Exam 7: Reverse Engineering and Cost Estimation in Construction Industry21 Questions
Select questions type
The concrete used for cement concrete roads is of grade _____________
Free
(Multiple Choice)
4.8/5
(31)
Correct Answer:
B
_____________ type of excavator is used for digging at or below the operating level.
Free
(Multiple Choice)
4.9/5
(31)
Correct Answer:
B
The rates of materials used for government works are approved by_____________
Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
D
Box culverts can be defined as a passage for water over a natural ground having a deck
(Multiple Choice)
4.9/5
(33)
Culverts cannot be constructed of a variety of materials including cast-in-place or precast concrete.
(True/False)
4.8/5
(31)
___________culverts have a concrete (sometimes other materials can be used too) floor allowing the water to flow smoothly through it.
(Multiple Choice)
4.9/5
(40)
Which of the following is the correct order of stages of estimation of concrete roads?
(Multiple Choice)
4.9/5
(48)
A structure that carries water above land is known as an _____________
(Multiple Choice)
4.8/5
(44)
A _____________can be used on wet ground and in all conditions of weather.
(Multiple Choice)
4.8/5
(37)
A _____________ is used to level the ground and spreads the loose material.
(Multiple Choice)
4.8/5
(33)
_____________type of excavator carries Shovel at its lower end.
(Multiple Choice)
4.8/5
(34)
A_____________is very useful equipment and it can be used for construction work like to clear the site of work, to make the land level, etc.
(Multiple Choice)
4.9/5
(29)
An ____________is an oldest type of machine which removes earth.
(Multiple Choice)
4.9/5
(40)
Construction or installation at a culvert site generally results in disturbance of the site soil.
(True/False)
4.8/5
(27)
____________type of excavator carries the skimmer at its lower end.
(Multiple Choice)
4.8/5
(34)
_____________type of excavator used for digging the foundation trenches below operating level.
(Multiple Choice)
4.8/5
(47)
If the span of crossing is greater than 12 feet (3.7 m), the structure is termed as bridge and otherwise is culvert.
(True/False)
4.8/5
(41)
_____________ are usually mounted on two or four pneumatic tyred wheels.
(Multiple Choice)
4.9/5
(33)
A culvert can be used to span over a canyon, or depression, or even over a freeway or roadway.
(True/False)
4.8/5
(38)
Showing 1 - 20 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)