Exam 4: Construction and Software Development Project Management
Exam 1: Construction and Costing Projects24 Questions
Exam 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow25 Questions
Exam 3: Structures, Equipment, and Materials Used in Construction25 Questions
Exam 4: Construction and Software Development Project Management20 Questions
Exam 5: Construction Techniques, Reports, and Cyber Crimes25 Questions
Exam 6: Cyber-Crimes, Quotations, Tenders, and Contract Law24 Questions
Exam 7: Reverse Engineering and Cost Estimation in Construction Industry21 Questions
Select questions type
For First class building drawing room and dining room floors shall be of _____________
Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
C
For 2nd class building rain water pipes shall be of _____________finished painted.
Free
(Multiple Choice)
4.8/5
(45)
Correct Answer:
A
For first class building the foundation and plinth shall be of 1st class brickwork in lime mortar or 1:2 cement mortar over lime concrete or 1:6:7 cement concrete.
Free
(True/False)
4.7/5
(30)
Correct Answer:
False
General specification gives the nature and the class of the work and the materials in general terms.
(True/False)
4.7/5
(36)
The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is___________
(Multiple Choice)
4.9/5
(40)
For third class building flooring shall be of brick-on-edge floor over well rammed earth.
(True/False)
4.8/5
(32)
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
(True/False)
4.7/5
(32)
It is often difficult to estimate size at an early stage in a project when only a specification is available
(True/False)
4.7/5
(37)
The unit of payment of cement concrete in lintels is_____________
(Multiple Choice)
4.8/5
(38)
The brick work is not measured in cu m in case of _____________
(Multiple Choice)
4.8/5
(32)
For fourth class building the doors and windows shall be of_____________wood or country wood.
(Multiple Choice)
4.8/5
(39)
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is
(Multiple Choice)
4.9/5
(34)
The specifications are written in a language so that they indicate what the work should be and words "shall be" or "should be" are used.
(True/False)
4.8/5
(34)
Specification does not specify or describes the nature and the class off the work, materials to be used in the work, workmanship, etc.
(True/False)
4.9/5
(46)
Which of the following are parameters involved in computing the total cost of a software development project?
(Multiple Choice)
4.8/5
(37)
Which of the following costs is not part of the total effort cost?
(Multiple Choice)
4.8/5
(34)
What is related to the overall functionality of the delivered software?
(Multiple Choice)
4.7/5
(29)
The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm, is termed as _____________
(Multiple Choice)
4.8/5
(25)
Filters