Exam 4: Measurement and Specification for Construction and Engineering
Exam 1: Construction and Measurement25 Questions
Exam 2: Mecasurement and Estimation in Construction Work25 Questions
Exam 3: Measurement and Estimation in Construction23 Questions
Exam 4: Measurement and Specification for Construction and Engineering8 Questions
Select questions type
The slope of the outlet of 'P trap' below the horizontal is kept
Free
(Multiple Choice)
4.7/5
(43)
Correct Answer:
D
The floor area includes the area of the balcony up to
Free
(Multiple Choice)
4.7/5
(37)
Correct Answer:
C
The expected out turn of half brick partition wall per mason per day is
Free
(Multiple Choice)
4.7/5
(23)
Correct Answer:
B
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
(Multiple Choice)
4.8/5
(38)