Exam 2: Mecasurement and Estimation in Construction Work
Exam 1: Construction and Measurement25 Questions
Exam 2: Mecasurement and Estimation in Construction Work25 Questions
Exam 3: Measurement and Estimation in Construction23 Questions
Exam 4: Measurement and Specification for Construction and Engineering8 Questions
Select questions type
Pick up the correct statement from the following:
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
B
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
B
Pick up the excavation where measurements are made in square metres for payment.
Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
D
The trap which is provided to disconnect the house drain from the street sewer is called
(Multiple Choice)
4.9/5
(36)
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
(Multiple Choice)
5.0/5
(39)
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
(Multiple Choice)
4.8/5
(40)
The concrete work for the following part of the building of specified thickness is measured in square metres
(Multiple Choice)
4.7/5
(28)
According to ISI method of measurement, the order of the sequence is
(Multiple Choice)
4.9/5
(35)
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
(Multiple Choice)
4.8/5
(43)
The expected out turn of 2.5 cm cement concrete floor per mansion per day
(Multiple Choice)
4.8/5
(29)
The value of 'A' of Indian type W.C. shown in the given figure is: 

(Multiple Choice)
4.8/5
(39)
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is 

(Multiple Choice)
4.9/5
(29)
Showing 1 - 20 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)