Exam 3: Methodology
Exam 1: Information Systems96 Questions
Exam 2: The Concept of Object Orientation98 Questions
Exam 3: Methodology100 Questions
Exam 4: Gathering Requirements100 Questions
Exam 5: Domain Analysis100 Questions
Exam 6: Behavioral Modeling I: Use Cases: The Basics95 Questions
Exam 7: Behavioral Modeling II: Developing Use Cases99 Questions
Exam 8: Structural Modeling99 Questions
Exam 9: Dynamic Modeling100 Questions
Exam 10: The Design Challenge97 Questions
Exam 11: Application Design I: Flow and Control98 Questions
Exam 12: Application Design IU: The User Interface99 Questions
Exam 13: Application Design III: Database and Persistence98 Questions
Exam 14: Patterns97 Questions
Exam 15: Components Reuse99 Questions
Exam 16: Architecture97 Questions
Exam 17: Implementation100 Questions
Select questions type
Which of the following does NOT guide us in consciously doing something?
(Multiple Choice)
4.8/5
(32)
The same methodology is recommended for both simple and complex software developments.
(True/False)
4.9/5
(41)
________ helps participants in the development understand, communicate, and verify the features of the product.
(Multiple Choice)
4.9/5
(30)
One of the most difficult issues in project development is ________.
(Multiple Choice)
4.8/5
(45)
Methodology is needed when man -made productions begin in a disorderly manner.
(True/False)
4.9/5
(44)
One of the challenges of project scheduling is how to prevent the ________ of resources as a result of task slack times.
(Multiple Choice)
4.8/5
(36)
Functional decomposition is a technique to discover the most atomic procedures from large-grain functions through a process of successive breakdowns.
(True/False)
4.7/5
(37)
CRC cards to represent objects (CRC stands for Class, Responsibilities and Collaboration) are used in the ________ phase of XP.
(Multiple Choice)
4.7/5
(42)
Prototyping may seem to be an ideal way to overcome the shortcomings of "traditional" SDLC methods, but it may create its own serious problems, such as ________.
(Multiple Choice)
4.9/5
(32)
If the actual deliverables match the planned deliverables, the project is in a good shape.
(True/False)
4.8/5
(35)
Showing 21 - 40 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)