Exam 3: Methodology

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

The iterative undertaking of software development does not fit into a sequential plan of actions.

(True/False)
4.8/5
(38)

The ________ defines the boundaries and goal of the project.

(Multiple Choice)
4.8/5
(35)

The goal of a project need not to be verifiable.

(True/False)
4.7/5
(35)

An activity thread is a set of road maps that all end at one point.

(True/False)
4.9/5
(40)

Describe the difference between methodology and method.

(Essay)
4.7/5
(32)

Scope-creep happens when additional features overstep the original scope.

(True/False)
4.8/5
(43)

The assembly line was ________ that took shape in the military to cope with the exigencies of funding and the battlefield.

(Multiple Choice)
4.9/5
(38)

The divide and conquer strategy leads to identifying ________ for a project.

(Multiple Choice)
4.8/5
(37)

Elaborate on the following: "Modeling is a super-methodology."

(Essay)
4.7/5
(30)

Differentiate technology from methodology and from method. Can you come up with an example that differentiates these concepts in a specific context, perhaps software development?

(Essay)
4.8/5
(24)

Describe the pros and cons of using methodology.

(Essay)
4.9/5
(30)

________ is the primary source behind the emergence of methodology.

(Multiple Choice)
4.9/5
(36)

Briefly describe the activities involved in XP.

(Essay)
4.9/5
(25)

Software development activities ? requirements gathering, analysis, logical design, physical design, architectural design, coding, testing, and deployment ________.

(Multiple Choice)
4.9/5
(31)

A better-known example of agile methods, and one of the earliest ones, is Extreme Programming (XP).

(True/False)
4.9/5
(44)

The completion date of a project is predetermined and never changes.

(True/False)
4.8/5
(39)

Compare and contrast prototyping to incremental approach.

(Essay)
4.8/5
(35)

To solve a problem, first you need to define the problem.

(True/False)
4.8/5
(32)

The spiral model combines the waterfall model with prototyping and iteration.

(True/False)
4.7/5
(38)

Characteristics for a good manager are all of the following except ________.

(Multiple Choice)
4.9/5
(37)
Showing 61 - 80 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)