Exam 3: Methodology
Exam 1: Information Systems96 Questions
Exam 2: The Concept of Object Orientation98 Questions
Exam 3: Methodology100 Questions
Exam 4: Gathering Requirements100 Questions
Exam 5: Domain Analysis100 Questions
Exam 6: Behavioral Modeling I: Use Cases: The Basics95 Questions
Exam 7: Behavioral Modeling II: Developing Use Cases99 Questions
Exam 8: Structural Modeling99 Questions
Exam 9: Dynamic Modeling100 Questions
Exam 10: The Design Challenge97 Questions
Exam 11: Application Design I: Flow and Control98 Questions
Exam 12: Application Design IU: The User Interface99 Questions
Exam 13: Application Design III: Database and Persistence98 Questions
Exam 14: Patterns97 Questions
Exam 15: Components Reuse99 Questions
Exam 16: Architecture97 Questions
Exam 17: Implementation100 Questions
Select questions type
The iterative undertaking of software development does not fit into a sequential plan of actions.
(True/False)
4.8/5
(38)
The ________ defines the boundaries and goal of the project.
(Multiple Choice)
4.8/5
(35)
An activity thread is a set of road maps that all end at one point.
(True/False)
4.9/5
(40)
Scope-creep happens when additional features overstep the original scope.
(True/False)
4.8/5
(43)
The assembly line was ________ that took shape in the military to cope with the exigencies of funding and the battlefield.
(Multiple Choice)
4.9/5
(38)
The divide and conquer strategy leads to identifying ________ for a project.
(Multiple Choice)
4.8/5
(37)
Differentiate technology from methodology and from method. Can you come up with an example that differentiates these concepts in a specific context, perhaps software development?
(Essay)
4.8/5
(24)
________ is the primary source behind the emergence of methodology.
(Multiple Choice)
4.9/5
(36)
Software development activities ? requirements gathering, analysis, logical design, physical design, architectural design, coding, testing, and deployment ________.
(Multiple Choice)
4.9/5
(31)
A better-known example of agile methods, and one of the earliest ones, is Extreme Programming (XP).
(True/False)
4.9/5
(44)
The completion date of a project is predetermined and never changes.
(True/False)
4.8/5
(39)
The spiral model combines the waterfall model with prototyping and iteration.
(True/False)
4.7/5
(38)
Characteristics for a good manager are all of the following except ________.
(Multiple Choice)
4.9/5
(37)
Showing 61 - 80 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)