Exam 4: Systems Planning and Selection

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

For each of the following walkthrough roles, match it with its description. -This person ensures that the work product meets the needs of the project's customers.

(Multiple Choice)
4.8/5
(38)

Match each of the following feasibility criteria with its purpose. -To gain an understanding of the degree to which the proposed system will likely solve the business problems or take advantage of the opportunities outlined in the Systems Service Request or project identification study

(Multiple Choice)
4.8/5
(43)

The Explanation of Services is a document prepared for the customer that describes what the project will deliver and outlines generally at a high level all work required to complete the project.

(True/False)
4.9/5
(30)

The current value of a future cash flow is referred to as:

(Multiple Choice)
4.8/5
(41)

For each of the following walkthrough roles, match it with its description. -This person reviews the work product in terms of future maintenance activities.

(Multiple Choice)
4.7/5
(31)

Potential development projects can be identified by:

(Multiple Choice)
4.8/5
(38)

Proper and insightful project initiation and planning, including determining project scope and identifying project activities, can reduce the time needed to complete later project phases, including systems analysis.

(True/False)
4.8/5
(33)

Match each of the following feasibility criteria with its purpose. -To identify the financial benefits and costs associated with the development project

(Multiple Choice)
4.8/5
(41)

Application software maintenance, new software and hardware leases, and incremental communications are examples of:

(Multiple Choice)
5.0/5
(40)

Analyzing an organization's activities to determine where value is added to products and/or services and the costs incurred best describes:

(Multiple Choice)
4.9/5
(44)

Referencing a walkthrough, the maintenance oracle ensures that the work product adheres to organizational technical standards.

(True/False)
4.8/5
(35)

If the net present value (NPV) of all costs is $100,000 and the NPV of all benefits is $170,000, then the ROI would be 35 percent.

(True/False)
4.9/5
(36)

Activities designed to assist in organizing a team to conduct project planning is the focus of:

(Multiple Choice)
4.8/5
(40)

Which of the following is NOT a project initiation activity?

(Multiple Choice)
4.9/5
(33)

Match each of the following feasibility criteria with its purpose. -To gain an understanding of the organization's ability to construct the proposed system

(Multiple Choice)
4.8/5
(36)

Which of the following is a project planning activity?

(Multiple Choice)
4.8/5
(37)

The reduction of waste creation is an example of a(n):

(Multiple Choice)
5.0/5
(40)

The Baseline Project Plan (BPP) is the primary deliverable from the project identification and selection phase.

(True/False)
4.8/5
(34)

The Internet is a global network comprised of thousands of interconnected individual networks that communicate with each other through transmission control protocol/internet protocol (TCP/IP).

(True/False)
4.8/5
(35)

An assessment of the development group's understanding of the possible target hardware, software, and operating environments, system size, complexity, and the group's experience with similar systems should be included as part of:

(Multiple Choice)
4.9/5
(37)
Showing 101 - 120 of 134
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)