A CASE ________ is a large collection of records, elements, diagrams, screens, reports, and other information stored about a particular project.

(Multiple Choice)
4.9/5
(33)

One important justification for CASE tools is to increase analyst ________.

(Multiple Choice)
4.8/5
(36)

A systems analyst should never be hired specifically to address information systems issues within a business.

(True/False)
4.8/5
(34)

Describe a situation in which an analyst would choose to use object-oriented systems analysis and design rather than the systems development life cycle.

(Essay)
4.8/5
(33)

Visible Analyst (VA)is not an example of a CASE tool that enables systems analysts to do graphical planning, analysis, and design in order to build complex client/server applications and databases.

(True/False)
4.9/5
(39)

It is the drawing of diagrams rather than in their modification that CASE tools excel over the use of templates.

(True/False)
4.8/5
(34)

CASE tools have the potential of increasing systems analysts' productivity.

(True/False)
4.8/5
(28)

The most comprehensive and responsible role that the systems analyst takes on is that of a(n)________.

(Multiple Choice)
4.9/5
(36)

The first phase of the systems development life cycle is critical to the success of the rest of the project.

(True/False)
4.9/5
(42)

After the system is installed, it must be ________, meaning that the computer programs must be modified and kept up to date.

(Multiple Choice)
4.8/5
(40)

An analyst should choose the Systems Development Life Cycle approach when:

(Multiple Choice)
4.8/5
(37)

A systems proposal is prepared after the analysis of system needs.

(True/False)
4.8/5
(37)

Which of the following do not describe how analysts use CASE tools?

(Multiple Choice)
4.8/5
(37)

A systems analyst should never draw on professional expertise concerning computer hardware and software and their uses in the business.

(True/False)
4.9/5
(39)

Another way to think about HCI is to think of it as a human-centered approach that puts people ahead of organizational structure or culture when creating new systems.

(True/False)
4.8/5
(30)

Object-oriented approaches use the industry standard for modeling object-oriented systems, called ________ to break down a system into a use case model.

(Multiple Choice)
4.8/5
(41)

The agile approach and the ________ approach both allow subsystems to be built one at a time until the entire system is complete.

(Multiple Choice)
4.9/5
(36)

Maintenance is performed:

(Multiple Choice)
4.9/5
(38)

The ________ is based on values, principles and core practices.

(Multiple Choice)
4.8/5
(38)

The open source software community is a monoculture, a single unified community.