Exam 11: Managing Systems Implementation
Exam 1: Introduction to Systems Analysis and Design112 Questions
Exam 2: Analyzing the Business Case112 Questions
Exam 3: Managing Systems Projects112 Questions
Exam 4: Requirements Modeling112 Questions
Exam 5: Data and Process Modeling112 Questions
Exam 6: Object Modeling112 Questions
Exam 7: Development Strategies112 Questions
Exam 8: User Interface Design112 Questions
Exam 9: Data Design112 Questions
Exam 10: System Architecture111 Questions
Exam 11: Managing Systems Implementation112 Questions
Exam 12: Managing Systems Support and Security112 Questions
Exam 13: Communication Tools45 Questions
Exam 14: Case Tools44 Questions
Exam 15: Financial Analysis Tools45 Questions
Exam 16: Internet Resource Tools45 Questions
Select questions type
____ cutover involves more risk than other changeover methods.
(Multiple Choice)
4.8/5
(36)
In ____ programming, two programmers work on the same task on the same computer.
(Multiple Choice)
4.8/5
(41)
The test environment for an information system contains ____.
(Multiple Choice)
4.9/5
(35)
Systems analysts prepare overall documentation, such as process descriptions and report layouts, early in the SDLC.
(True/False)
4.7/5
(48)
In addition to analyzing logic and program code, a project team usually holds a session with users, called a ____ walkthrough, to review the interface with a cross-section of people who will work with the new system and ensure that all the necessary features have been included.
(Multiple Choice)
4.9/5
(33)
After completing integration testing, a systems analyst must perform ____________________, which involves the entire information system and includes all typical processing situations.
(Short Answer)
4.9/5
(39)
The objective of ____ testing is to identify and eliminate execution errors that could cause a program to terminate abnormally, and logic errors that could have been missed during desk checking.
(Multiple Choice)
4.7/5
(42)
Whenever possible, people who were not directly involved in developing a system should conduct the post-implementation evaluation.
(True/False)
4.9/5
(38)
Many organizations require a more formal type of desk checking called a structured walkthrough, or ____ review.
(Multiple Choice)
5.0/5
(43)
-At the end of the systems implementation phase, the final report to management should include ____.

(Multiple Choice)
4.7/5
(32)
Testing two or more programs that depend on each other is called ____________________.
(Short Answer)
4.8/5
(39)
The environment for the actual system operation is called the ____________________ environment.
(Short Answer)
4.9/5
(39)
____ graphically represent the logical rules and interaction between program modules using a series of symbols connected by arrows.
(Multiple Choice)
4.9/5
(33)
Software ____ is a software development process that stresses solid design, effective structure, accurate documentation, and careful testing.
(Multiple Choice)
4.8/5
(38)
Using a ____ strategy, knowledgeable users can be selected who then conduct sessions for others.
(Multiple Choice)
4.9/5
(44)
MATCHING
Identify the letter of the choice that best matches the phrase or definition.a.training plan
f.pseudocode
b.status flag
g.operational
c.control
h.top-down
d.parallel
i.phased
e.release plan
j.data conversion
-This should be considered early in the systems development process.
(Short Answer)
4.8/5
(31)
If a module must be made more cohesive, it can be combined into one unit, which performs multiple functions.
(True/False)
4.7/5
(36)
Data conversion is easier when the new system replaces a manual system, because all data can be entered manually, unless it must be scanned.
(True/False)
4.8/5
(40)
A Web site for the ____ describes a variety of IT education and training resources.
(Multiple Choice)
4.8/5
(34)
Showing 61 - 80 of 112
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)