Exam 37: Construction of Semicircular and Segmental Arches
Exam 1: Safety on the Job20 Questions
Exam 2: Basic Tools of the Trade15 Questions
Exam 3: Learning to Use the Basic Tools20 Questions
Exam 4: Related Equipment20 Questions
Exam 5: Development of Clay and Shale Brick15 Questions
Exam 6: Manufacture of Brick10 Questions
Exam 7: Development of Concrete Block15 Questions
Exam 8: Manufacture of Concrete Block Masonry10 Questions
Exam 9: Mixing Mortar15 Questions
Exam 10: Laying the Brick to the Line20 Questions
Exam 11: Building the Brick Corner15 Questions
Exam 12: The Development of Mortar15 Questions
Exam 13: Types of Mortar and Their Characteristics15 Questions
Exam 14: Introduction to Bonding10 Questions
Exam 15: Traditional Structural and Pattern Bonds10 Questions
Exam 16: Laying Concrete Block to the Line15 Questions
Exam 17: Building the Block Corner10 Questions
Exam 18: Bonding Concrete Block and Rules for Bonding10 Questions
Exam 19: Estimating Brick Masonry by Rule of Thumb10 Questions
Exam 20: Estimating Concrete Block Masonry Materials10 Questions
Exam 21: Cutting With the Masonry Saw15 Questions
Exam 22: Building a Masonry Composite Wall of Brick and Concrete Block10 Questions
Exam 23: Cavity and Reinforced Masonry Walls15 Questions
Exam 24: Masonry Supports, Chases, and Bearings15 Questions
Exam 25: Movement Joints and Intersecting Walls10 Questions
Exam 26: Installing Anchor Bolts, Brick Corbeling, and Wall Copings10 Questions
Exam 27: Glass Block Masonry15 Questions
Exam 28: Types of Scaffolding10 Questions
Exam 29: Safety Rules for Erecting and Using Scaffolding15 Questions
Exam 30: Cleaning Brick and Concrete Block15 Questions
Exam 31: Removing Various Stains From Masonry Walls15 Questions
Exam 32: One-Flue Chimneys15 Questions
Exam 33: History, Theory, and Function of a Fireplace and Chimney15 Questions
Exam 34: Design and Construction of Fireplaces and Chimneys25 Questions
Exam 35: Multiple-Opening and Heat-Circulating Fireplaces10 Questions
Exam 36: Development of Arches10 Questions
Exam 37: Construction of Semicircular and Segmental Arches15 Questions
Exam 38: Construction of a Jack Arch10 Questions
Exam 39: Concrete Forms and Placing Footings15 Questions
Exam 40: Essentials of Concrete Work20 Questions
Exam 41: Line and Symbol Identification10 Questions
Exam 42: The Working Drawings10 Questions
Exam 43: Dimensions and Scales10 Questions
Select questions type
Rowlocks should not be used as a bonding arrangement for semicircular brick arches.
Free
(True/False)
4.9/5
(43)
Correct Answer:
False
A bonded soldier course is a minimum of _____ in height.
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
C
Do not remove the arch forms until the arch has cured enough to carry its own weight without sagging.
Free
(True/False)
4.8/5
(38)
Correct Answer:
True
A mason should not construct an arch form but rather find a carpenter to complete this task.
(True/False)
4.8/5
(33)
For minor arches _____ is usually enough time for curing if the temperature is not freezing and the mortar is setting correctly.
(Multiple Choice)
4.7/5
(43)
Brick arches are for aesthetic purposes and should not be used to support a heavy load.
(True/False)
4.9/5
(31)
If a brick must be moved after the mortar in the arch has set, fresh mortar should be applied and the brick relaid.
(True/False)
4.9/5
(40)
Construction of an arch is always begun at the two ends and laid up to the center of the arch.
(True/False)
4.9/5
(32)
The rule for segmental arch construction is that the minimum rise should always be _____ the width of the opening or span, if the arch is to be self supporting and not on a form.
(Multiple Choice)
4.9/5
(45)
Arch brick can be laid in several positions for semicircular arches.
(True/False)
4.7/5
(39)
For arches _____ long, a good construction grade of ¾" plywood is excellent for the front and back of the arch form.
(Multiple Choice)
4.8/5
(39)
The mortar joints on an arch should be large to give support to the arch.
(True/False)
4.9/5
(35)
The bottom mortar joint that is set on an arch form should be slightly angled inward because it must be cut out with a chisel to a depth of _____ after the arch form is removed and repointed.
(Multiple Choice)
4.8/5
(34)
Any type of arch needs to have flashing and weep holes installed to prevent moisture from penetrating and staying in the wall.