Exam 9: Systems Development and Project Management: Corporate Responsibility

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Project __________ are quantifiable criteria that must be met for the project to be considered a success.

Free
(Short Answer)
4.9/5
(44)
Correct Answer:
Verified

Objectives

What is the success rate for a project using the waterfall methodology?

Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
Verified

A

Which of the following is a business-related consequence of successful software?

Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
Verified

A

In a Gantt chart, tasks are listed __________, and the project's time frame is listed ____________.

(Multiple Choice)
4.9/5
(32)

The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.

(True/False)
4.7/5
(42)

What is a project manager?

(Multiple Choice)
4.8/5
(46)

A project ____________ is a formal, approved document that manages and controls project execution.

(Short Answer)
4.7/5
(42)

An organization must identify what it wants to do and how it is going to do it.What does the "what" part of this question focus on?

(Multiple Choice)
4.9/5
(39)

Planning, ___________, design, development, testing, implementation, and maintenance are the seven phases in the SDLC.

(Short Answer)
4.7/5
(46)

What is the design phase in the SDLC?

(Multiple Choice)
4.8/5
(38)

In the past, outsourcing was often used tactically as a quick-fix, short-term solution to a particular need or problem that did not form part of an overall business strategy.

(True/False)
4.8/5
(30)

What are project deliverables?

(Multiple Choice)
4.8/5
(40)

Which of the following is the primary reason companies outsource?

(Multiple Choice)
4.7/5
(38)

Which of the following is a fundamental of the RAD methodology?

(Multiple Choice)
4.8/5
(41)

The R in the SMART criteria for successful objective creation stands for _________.

(Short Answer)
4.7/5
(40)

A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.

(True/False)
4.8/5
(37)

Which of the following is not a characteristic of a well-defined project plan?

(Multiple Choice)
5.0/5
(45)

Describe the project stakeholder's and executive sponsor's roles in choosing strategic projects.

(Essay)
4.9/5
(37)

Describe the two primary diagrams most frequently used in project planning.

(Essay)
4.7/5
(43)

Which methodology is owned by IBM?

(Multiple Choice)
4.8/5
(36)
Showing 1 - 20 of 114
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)