Exam 9: Systems Development and Project Management: Corporate Responsibility

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

It is important to understand that SOA is not a concrete architecture; it is thought that leads to a concrete architecture.It might be described as a style,paradigm,concept,perspective,philosophy,or representation.That is,SOA is an approach,a way of thinking,a value system that leads to decisions that design a concrete architecture allowing enterprises to plug in new services or upgrade existing services in a granular approach.

(True/False)
4.8/5
(35)

What is the capability of services to be joined together on demand to create composite services,or disassembled just as easily into their functional component?

(Multiple Choice)
4.9/5
(39)

What is a business task?

(Multiple Choice)
4.9/5
(38)

What is the logical relationship that exists between the project tasks,or between a project task and a milestone?

(Multiple Choice)
4.9/5
(38)

In the past,outsourcing was often used tactically,as a quick-fix,short-term solution to a particular need or problem which did not form part of an overall business strategy.

(True/False)
4.8/5
(32)

Which of the following is the least common reason why companies outsource?

(Multiple Choice)
4.8/5
(38)

Which gate is elaboration?

(Multiple Choice)
4.9/5
(39)

What are the specific business requests the system must meet to be successful,so the analysis phase is critical because business requirements drive the entire systems development effort?

(Multiple Choice)
5.0/5
(36)

Discovery prototyping builds a small-scale representation or working model of the system to ensure it meets the user and business requirements.

(True/False)
4.8/5
(32)

What determines if the system satisfies the user and business requirements?

(Multiple Choice)
4.7/5
(37)

Conversion modifies software to meet specific user or business requirements.

(True/False)
4.8/5
(37)

Alpha testing occurs when programmers test the system to ensure it is bug-free.

(True/False)
4.8/5
(34)

What is interoperability?

(Multiple Choice)
4.9/5
(43)

Which reports provide an internal report that highlights situations occurring outside of the normal operating range for a condition or standard?

(Multiple Choice)
4.7/5
(30)

A kill switch is a logical relationship that exists between the project tasks,or between a project task and a milestone.

(True/False)
4.8/5
(30)

Which gate questions answered in this phase address ownership of the system and training of key personnel?

(Multiple Choice)
4.7/5
(33)

What occurs when programmers test the system to ensure it is bug-free?

(Multiple Choice)
4.7/5
(33)

Which of the following is a benefit an organization can receive from outsourcing?

(Multiple Choice)
4.9/5
(33)

Process modeling involves graphically representing the processes that capture,manipulate,store,and distribute information between a system and its environment.

(True/False)
4.8/5
(32)

Who are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion?

(Multiple Choice)
4.9/5
(39)
Showing 241 - 260 of 321
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)