Exam 5: Activity-Based Costing and Customer Profitability Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Using ABC, what is the overhead cost per unit produced for Job M2?

(Multiple Choice)
4.9/5
(40)

The cost of unused capacity can be determined using ABC costing for the purpose of:

(Multiple Choice)
4.9/5
(36)

Assume the cost per setup remains at $2,000 but that the batch size for product Alpha is changed from 10 to 25 units per batch. Using activity-based and a volume-based overhead costing that uses direct labor-hours to assign overhead, the amount of setup cost applied to each unit of product Alpha would be (rounded to the nearest cent): Assume the cost per setup remains at $2,000 but that the batch size for product Alpha is changed from 10 to 25 units per batch. Using activity-based and a volume-based overhead costing that uses direct labor-hours to assign overhead, the amount of setup cost applied to each unit of product Alpha would be (rounded to the nearest cent):

(Multiple Choice)
4.8/5
(33)

Castenet Company uses a volume-based costing system that applies overhead cost based on direct labor hours at $250 per direct labor hour. The company is considering adopting an activity-based costing system with the following data: Castenet Company uses a volume-based costing system that applies overhead cost based on direct labor hours at $250 per direct labor hour. The company is considering adopting an activity-based costing system with the following data:   The two jobs processed in the month of June had the following characteristics:   Required: 1. Compute the unit manufacturing cost of each job under the firm's current volume-based costing system. 2. Compute the unit manufacturing cost of each job under the activity-based costing system. 3. Compare the unit manufacturing cost for Jobs A and B computed in requirements 1 and 2. (a) Why do the two cost systems differ in their total cost for each job? (b) Why might these differences be important to the Company? The two jobs processed in the month of June had the following characteristics: Castenet Company uses a volume-based costing system that applies overhead cost based on direct labor hours at $250 per direct labor hour. The company is considering adopting an activity-based costing system with the following data:   The two jobs processed in the month of June had the following characteristics:   Required: 1. Compute the unit manufacturing cost of each job under the firm's current volume-based costing system. 2. Compute the unit manufacturing cost of each job under the activity-based costing system. 3. Compare the unit manufacturing cost for Jobs A and B computed in requirements 1 and 2. (a) Why do the two cost systems differ in their total cost for each job? (b) Why might these differences be important to the Company? Required: 1. Compute the unit manufacturing cost of each job under the firm's current volume-based costing system. 2. Compute the unit manufacturing cost of each job under the activity-based costing system. 3. Compare the unit manufacturing cost for Jobs A and B computed in requirements 1 and 2. (a) Why do the two cost systems differ in their total cost for each job? (b) Why might these differences be important to the Company?

(Essay)
4.7/5
(33)

Using activity-based costing, applied miscellaneous factory overhead for the 1,000 laser printers order based on direct labor hours is:

(Multiple Choice)
4.9/5
(30)

Using activity-based costing, applied miscellaneous overhead for the HighF model per unit is (rounded to the nearest cent):

(Multiple Choice)
5.0/5
(29)

In performing activity analysis during the design of an activity-based costing system (ABC), the management accountant studies:

(Multiple Choice)
4.9/5
(30)

What is Nerrod's total customer-sustaining cost applicable to Ninto?

(Multiple Choice)
5.0/5
(35)

With a volume-based costing system that applies overhead based on direct labor hours, the setup cost portion of overhead for each unit is (rounded to the nearest cent): With a volume-based costing system that applies overhead based on direct labor hours, the setup cost portion of overhead for each unit is (rounded to the nearest cent):

(Multiple Choice)
4.9/5
(43)
Showing 141 - 149 of 149
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)