Exam 10: Waiting Line Analysis and Simulation
Exam 1: Introduction72 Questions
Exam 2: Strategy50 Questions
Exam 4: Project Management72 Questions
Exam 3: Design of Products and Services53 Questions
Exam 5: Strategic Capacity Management57 Questions
Exam 6: Learning Curves55 Questions
Exam 7: Manufacturing Processes41 Questions
Exam 8: Facility Layout55 Questions
Exam 9: Service Processes61 Questions
Exam 10: Waiting Line Analysis and Simulation70 Questions
Exam 11: Process Design and Analysis53 Questions
Exam 12: Six Sigma Quality69 Questions
Exam 13: Statistical Quality Control63 Questions
Exam 14: Lean Supply Chains71 Questions
Exam 15: Logistics Distribution, and Transportation55 Questions
Exam 16: Global Sourcing and Procurement66 Questions
Exam 17: Enterprise Resource Planning Systems45 Questions
Exam 18: Forecasting90 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management102 Questions
Exam 21: Material Requirements Planning83 Questions
Exam 22: Workcenter Scheduling61 Questions
Exam 23: Theory of Constraints55 Questions
Exam 24: Health Care60 Questions
Exam 25: Operations Consulting53 Questions
Select questions type
A roller coaster ride in an amusement park employs which type of queuing system line structure?
Free
(Multiple Choice)
4.7/5
(46)
Correct Answer:
A
The more time, money, and effort you spend developing a simulation model, the more likely you are to achieve useful results.
Free
(True/False)
4.9/5
(42)
Correct Answer:
False
The demand on a hospital's emergency medical services is considered an uncontrollable arrival pattern of the calling population.
Free
(True/False)
4.9/5
(41)
Correct Answer:
True
The customer arrivals in a queuing system come almost exclusively from finite populations.
(True/False)
4.9/5
(36)
A variable arrival rate is more common in waiting line management than a constant arrival rate.
(True/False)
4.8/5
(33)
Regardless of the computer language chosen for a simulation model, too much data from a simulation can be dysfunctional to problem solving.
(True/False)
4.7/5
(40)
Customers arrive at a common queue at the coffee station with two identical coffee machines in a busy mall at the rate of 48 per hour, following Poisson distribution.Each customer mixes his or her specialty coffee taking 2 minutes on an average following an exponential process.What is the expected number of customers in the system at this coffee station?
(Multiple Choice)
4.9/5
(42)
A finite population in waiting line management refers to a population that is large enough in relation to the service system so that the change in population size caused by subtractions or additions to the population does not significantly affect the system probabilities.
(True/False)
4.8/5
(41)
Highest-profit customer first is a queue discipline discussed in the textbook.
(True/False)
4.8/5
(37)
Which of the following queue disciplines is discussed in the textbook?
(Multiple Choice)
4.9/5
(35)
In a practical sense, an infinite queue is one that includes every possible member of the served population.
(True/False)
4.8/5
(40)
In a department 25 machines are kept running by three operators who respond to randomly occurring equipment problems.
(True/False)
4.8/5
(34)
In modeling a simulation, random numbers from 00 to 99 are assigned with the intervals determined from frequency distributions for each behavior occurrence.Assume there are two behaviors, A and B, out of 100 tallies.On behavior A you record 45 tallies, and on behavior B you record 55 tallies.Which of the following is a correct random-number interval for behavior A?
(Multiple Choice)
4.9/5
(45)
The customer arrivals in a queuing system come almost exclusively from infinite populations.
(True/False)
4.9/5
(37)
In modeling a simulation, random numbers from 00 to 99 are assigned with the intervals determined from frequency distributions for each behavior occurrence.Assume there are two behaviors, A and B, out of 50 tallies.On behavior A you record 15 tallies, and on behavior B you record 35 tallies.Which of the following is a correct random-number interval for behavior A (Choose the most appropriate answer)?
(Multiple Choice)
4.8/5
(29)
Which of the following is an example of general-purpose simulation software?
(Multiple Choice)
4.7/5
(34)
Which of the following is not an example of general-purpose simulation software?
(Multiple Choice)
4.9/5
(38)
In a college registration process, several department heads have to approve an individual student's semester course load.What is the queuing system line structure?
(Multiple Choice)
4.9/5
(34)
A small vendor has either a good day of sales with an average of $1,000 or a bad day with an average of only $500 for the day.To simulate these outcomes, random numbers from 00 to 99 should be assigned with the intervals determined from the frequency distribution.If, during the last 100 days, the vendor had 27 good days and 73 bad days, which of the following is a correct random-number interval for a bad day?
(Multiple Choice)
4.7/5
(38)
Ideally, in waiting line or queuing analysis, we want to balance the cost of service capacity with the cost of waiting.
(True/False)
4.7/5
(40)
Showing 1 - 20 of 70
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)