Exam 5: Cost Management in an Automated Business Environment: ABC, ABM, and TQM

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statement(s)regarding activity-based costing is (are)

(Multiple Choice)
4.8/5
(41)

Gaining personnel support and obtaining accurate data are two of the more challenging obstacles to the implementation of a successful activity basedactivity-based costing system.

(True/False)
4.9/5
(38)

Which of the following is an upstream cost?

(Multiple Choice)
4.9/5
(32)

Direct labor hours is an appropriate cost driver when:

(Multiple Choice)
4.7/5
(38)

Traditionally,the most popular company-wide base for allocating overhead to products was:

(Multiple Choice)
4.8/5
(31)

The objective of target pricing is to establish a price that will maximize profits given existing costs.

(True/False)
4.8/5
(42)

The voluntary costs of quality include:

(Multiple Choice)
4.9/5
(35)

Pro Tool Company expects to produce 24,000 total units during the current period.The costs and cost drivers associated with four activity cost pools are given below: ACTIVITIES: Cost Cost Driver UNIT LEVEL \ 50,000 4,000 labor hrs BATCH LEVEL \ 20,000 100 set ups PRODUCT LEVEL \ 10,000 \% of use FACILITY LEVEL \ 120,000 24,000 units Production of 1,000 units of an auto towing tool required 800 labor hours,12 setups,and consumed 30% of the product sustaining activities.How much total overhead cost will be allocated to this product if the company allocates overhead on the basis of a single overhead allocation rate based on direct labor hours?

(Multiple Choice)
4.8/5
(29)

In the below graph,which shows the relationship among components of quality cost,Line "B" depicts: In the below graph,which shows the relationship among components of quality cost,Line B depicts:

(Multiple Choice)
4.8/5
(44)

The amounts of voluntary costs and failure costs:

(Multiple Choice)
4.9/5
(42)

Hough Company manufactures a wide variety of products.A high proportion of its indirect costs are batch-level costs,such as acquiring materials,moving materials within the factory,and setting up machines.Hough uses direct labor hours to assign indirect costs to all of its products.How is this use of a traditional product costing system likely to affect the costs of Hough's high-volume and low-volume products?

(Multiple Choice)
4.8/5
(34)

What is the likely consequence of using a single overhead rate rather than activity-based costing?

(Essay)
4.9/5
(39)

The objective of using the following graph is to: The objective of using the following graph is to:

(Multiple Choice)
5.0/5
(45)
Showing 141 - 153 of 153
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)