Exam 2: Systems Techniques and Documentation
Exam 1: Accounting Information Systems: An Overview163 Questions
Exam 2: Systems Techniques and Documentation136 Questions
Exam 3: Ebusiness and Ecommerce121 Questions
Exam 4: Transaction Processing and the Internal Control Process138 Questions
Exam 5: Fraud Examination and Fraud Management134 Questions
Exam 6: Information Systems Security172 Questions
Exam 7: Electronic Data Processing Systems128 Questions
Exam 8: Revenue Cycle Processes128 Questions
Exam 9: Procurement and Human Resources Business Processes121 Questions
Exam 10: The Production Business Process130 Questions
Exam 11: Systems Planning, analysis, and Design163 Questions
Exam 12: Systems Project Management, implementation, operation, control135 Questions
Exam 13: Data Management Concepts147 Questions
Exam 14: Auditing Information Technology126 Questions
Select questions type
Which of the following is not a basic symbol used in logical data flow diagrams?
(Multiple Choice)
4.8/5
(41)
________ ________ are a fact-gathering technique where persons provide written answers to general,rather than specific,questions.
(Short Answer)
4.7/5
(39)
The normal flow direction of a flowchart is from left to right and top to bottom.
(True/False)
4.8/5
(34)
The ________ symbol is used when additional descriptions or explanations are needed to clarify a point on the flowchart.
(Short Answer)
4.7/5
(33)
The intent of using DFDs is to clearly separate the logical process of systems analysis from the physical process of systems design.
(True/False)
4.8/5
(27)
HIPO structures a "bottom-up" strategy in structured systems analysis and design.
(True/False)
4.8/5
(36)
UML version 2.4 defines ________ types of diagrams,divided into two categories.
(Multiple Choice)
4.8/5
(34)
Which of the following would not appear in a HIPO chart of a payroll system?
(Multiple Choice)
4.8/5
(32)
The triangle is a specialized symbol representing a decision process.
(True/False)
4.8/5
(34)
Systems techniques assist the analyst in the collection and organization of facts.
(True/False)
4.8/5
(47)
The following data is related to the time required to post checks drawn by the Last National Bank's depositors:
Number of checks posted 795 Total elapsed minutes 520 Rest period minutes 12 Interruption minutes 15 Required:
a.Calculate the standard posting time per check.
b.Calculate the combined rest and interruption time as a percentage of the standard time per check.
(Essay)
4.9/5
(28)
The forms distribution chart is closely related to the document flowchart.
(True/False)
4.8/5
(33)
________ flowcharts are organized into columns or groups representing processing functions performed by different entities.
(Short Answer)
4.8/5
(39)
In the United States,the AICPA is responsible for establishing standard flowchart symbols.
(True/False)
4.9/5
(43)
After operational characteristics of a system have been identified and selected through some form of work measurement,a work ________ ________ must be undertaken to assign specific tasks to employees.
(Short Answer)
4.9/5
(32)
UML includes techniques that are the functional equivalents of
(Multiple Choice)
4.9/5
(33)
The following data is related to the time required to post Kriptonite Corporation's daily general ledger entries:
Number of GL entries posted 850 Total elapsed minutes 340 Rest period minutes 6 Interruption minutes 6.5 Required:
a.Calculate the standard posting time per GL entry.
b.Calculate the combined rest and interruption time as a percentage of the standard time per GL entry.
(Essay)
4.8/5
(34)
In an analytic flowchart,the symbol which could be used to indicate unclaimed payroll checks is the
(Multiple Choice)
4.9/5
(32)
Showing 41 - 60 of 136
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)