Exam 19: Inventory management with uncertain demand
Exam 1: Introduction24 Questions
Exam 2: Linear programming: Basic Concepts84 Questions
Exam 3: Linear programming: Formulation and applications57 Questions
Exam 4: Theart of modeling with spread sheets31 Questions
Exam 5: What-If Analysis for linear programming57 Questions
Exam 6: Network optimization problems48 Questions
Exam 7: Using binary integer programming to deal withy es-Or-No decisions28 Questions
Exam 8: Non linear programming52 Questions
Exam 9: Decision Analysis78 Questions
Exam 10: Forecasting76 Questions
Exam 11: Queuing models74 Questions
Exam 12: Computer simulation: Basic Concepts44 Questions
Exam 13: Computer simulation with risks olver platform47 Questions
Exam 14: Solution concepts for linear programming45 Questions
Exam 15: Transportation and assignment problems48 Questions
Exam 16: Pert CPM models for project management92 Questions
Exam 17: Goal programming21 Questions
Exam 18: Inventory management with known demand64 Questions
Exam 19: Inventory management with uncertain demand43 Questions
Exam 20: Computer simulation with crystal ball51 Questions
Select questions type
A multiechelon inventory system is a system with multiple echelons of inventory where each echelon is used to replenish the inventories at the various sites of the next lower echelon
(True/False)
4.9/5
(43)
Which one of the following is not generally a determinant of the reorder point?
(Multiple Choice)
4.8/5
(31)
The EOQ and (R,Q)models are appropriate if unused items can be carried over into subsequent time periods
(True/False)
5.0/5
(35)
The goal of the perishable product model is to identify the order quantity that will minimize the shortage costs
(True/False)
4.9/5
(34)
The need for safety stocks can be reduced by an operation strategy which:
(Multiple Choice)
4.9/5
(34)
The reorder point equals the average sales during lead time plus the number of backlogged items
(True/False)
4.8/5
(29)
When the item is offered for resale,shortage costs in the perishable product model can include a charge for loss of customer goodwill
(True/False)
4.8/5
(41)
To provide satisfactory levels of customer service while keeping inventory costs within reasonable bounds,two fundamental decisions must be made about inventory: the timing and size of orders
(True/False)
4.8/5
(31)
Which of the following is not an assumption of the perishable product model?
(Multiple Choice)
4.9/5
(37)
A company's supply chain consists of the flow of materials and information from suppliers,through production,to the end users
(True/False)
5.0/5
(34)
Holding backorders when shortages occur and then filling them when inventory is replenished is referred to as shortordering
(True/False)
4.9/5
(34)
In the ABC control method,items that have high unit costs are always classified as A items
(True/False)
4.8/5
(33)
If average demand for an inventory item is 200 units per day,lead time is three days,and safety stock is 100 units,the reorder point is:
(Multiple Choice)
4.9/5
(43)
Which inventory model is most appropriate if unused or unsold items cannot be carried over to subsequent periods?
(Multiple Choice)
4.7/5
(31)
In a perishable products model,if shortage and excess costs are equal,then the optimum service level is:
(Multiple Choice)
4.8/5
(32)
If,in a perishable product inventory situation,the probabilities of demand being 1,2,3,or 4 units are 0 3,0 3,0 2,and 0 2 respectively,what is the service level if two units are stocked?
(Multiple Choice)
4.7/5
(34)
The service level in a perishable product model is the probability that no shortage will occur
(True/False)
4.7/5
(39)
One consequence of uncertain demand is the risk of incurring shortages
(True/False)
4.9/5
(30)
The choice of the distribution to use as the demand distribution has little effect on the reorder point
(True/False)
4.7/5
(41)
Showing 21 - 40 of 43
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)