Exam 12: Lean Principles, Lean Accounting, and Activity Analysis
Exam 1: Managerial Accounting Concepts and Principles201 Questions
Exam 2: Job Order Costing195 Questions
Exam 3: Process Cost Systems198 Questions
Exam 4: Cost Behavior and Cost-Volume-Profit Analysis225 Questions
Exam 5: Variable Costing for Management Analysis160 Questions
Exam 6: Budgeting197 Questions
Exam 7: Performance Evaluation Using Variances From Standard Costs175 Questions
Exam 8: Performance Evaluation for Decentralized Operations218 Questions
Exam 9: Differential Analysis, Product Pricing, and Activity-Based Costing175 Questions
Exam 10: Capital Investment Analysis190 Questions
Exam 11: Cost Allocation and Activity-Based Costing110 Questions
Exam 12: Lean Principles, Lean Accounting, and Activity Analysis137 Questions
Exam 13: Statement of Cash Flows189 Questions
Exam 14: Financial Statement Analysis198 Questions
Select questions type
Identify the following quality control activities as either value-added or non-value-added.
-Finished goods inspection
(Multiple Choice)
4.8/5
(40)
Push manufacturing is also referred to as make-to-order processing.
(True/False)
4.9/5
(38)
Axelgold Company produces parts for the auto industry.Part X2 is machined in Department #1, which has the following budgeted conversion costs:
All costs are driven by machine hours.Total possible hours for the year are 2,800.It takes .03 hours to machine one unit of Part X2.
a Compute Department #1's budgeted cell conversion cost rate for the current year.Round to the nearest cent.
b Compute Part X2's budgeted cell conversion cost per unit.Round to the nearest cent.

(Essay)
4.9/5
(37)
In a lean system, indirect labor is traced directly to product cells.
(True/False)
4.9/5
(31)
Identify the following quality control activities as either value-added or non-value-added.
-Rework
(Multiple Choice)
4.8/5
(39)
manufacturing philosophy emphasizes quality and zero defects.
(Multiple Choice)
4.8/5
(32)
In the lean principles philosophy, unexpected downtime is the result of unreliable processes.
(True/False)
4.9/5
(40)
A nonfinancial measure is operating information that has not been translated into dollars.
(True/False)
4.8/5
(27)
Identity the following by their type of quality cost.
-Operator training
(Multiple Choice)
4.8/5
(33)
Identify the following quality control activities as either value-added or non-value-added.
-Preventive machine maintenance
(Multiple Choice)
4.7/5
(52)
From the above schedule, calculate the a prevention and b appraisal costs.
(Essay)
4.9/5
(36)
In a lean environment, process problems are more visible than they are in a traditional environment.
(True/False)
4.8/5
(38)
Lead time reduction can be a cost-saving goal for any processed item.
(True/False)
4.8/5
(41)
Identity the following by their type of quality cost.
-Recalls
(Multiple Choice)
5.0/5
(35)
Set up time is disregarded as an improvement priority under the manufacturing concept.
(Multiple Choice)
4.8/5
(39)
From the foregoing information, determine the budgeted cell conversion cost per unit.
(Multiple Choice)
5.0/5
(38)
Which of the following are features of the lean manufacturing system?
a maintaining excess inventory to ensure that products will always be available
b cross training of employees
c giving employees additional authority and responsibility
d product-oriented layout
e increased set-up time
(Essay)
4.8/5
(31)
Showing 61 - 80 of 137
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)