Exam 11: Lodging Planning and Design
Exam 1: The Role, Cost, and Management of Hospitality Facilities10 Questions
Exam 2: Hospitality Facilites Management Tools, Techniques, and Trends10 Questions
Exam 3: Environmental and Sustainability Management10 Questions
Exam 4: Safety and Secuiryt Systems10 Questions
Exam 5: Water and Wasterwater Systems10 Questions
Exam 6: Electrical Systems10 Questions
Exam 7: Heating, Ventilating, and Air Conditioning Systems8 Questions
Exam 8: Lighting Systems10 Questions
Exam 9: Laundry Systems10 Questions
Exam 10: Building Structure, Finishes, and Site10 Questions
Exam 11: Lodging Planning and Design8 Questions
Exam 12: Renovation and Capital Projects10 Questions
Select questions type
The most prominent hotel public space is the:
Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
D
The process for developing a new hotel typically takes approximately:
Free
(Multiple Choice)
4.8/5
(28)
Correct Answer:
C
The double-loaded slab guestroom floor configuration features:
Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
A
The first design phase of a hotel construction project is called:
(Multiple Choice)
4.7/5
(37)
The largest back-of-the-house area in most hotels and the one requiring the most design attention is:
(Multiple Choice)
4.9/5
(45)
The most efficient guestroom floor configuration in terms of saleable gross floor area is:
(Multiple Choice)
4.8/5
(31)