Exam 12: Renovation and Capital Projects
Exam 1: The Role, Cost, and Management of Hospitality Facilities10 Questions
Exam 2: Hospitality Facilites Management Tools, Techniques, and Trends10 Questions
Exam 3: Environmental and Sustainability Management10 Questions
Exam 4: Safety and Secuiryt Systems10 Questions
Exam 5: Water and Wasterwater Systems10 Questions
Exam 6: Electrical Systems10 Questions
Exam 7: Heating, Ventilating, and Air Conditioning Systems8 Questions
Exam 8: Lighting Systems10 Questions
Exam 9: Laundry Systems10 Questions
Exam 10: Building Structure, Finishes, and Site10 Questions
Exam 11: Lodging Planning and Design8 Questions
Exam 12: Renovation and Capital Projects10 Questions
Select questions type
Which of the following estimating methods is the most accurate?
Free
(Multiple Choice)
4.9/5
(40)
Correct Answer:
A
Major renovations are usually done on a __________ cycle.
Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
C
Why is it a good idea to hire design professionals for all but the very smallest renovation projects?
Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
D
Equipment or materials that are functionally, operationally, and aesthetically equivalent to higher-priced items made by different manufacturers are called:
(Multiple Choice)
4.7/5
(47)
The property's renovation manager should clarify the contractor's responsibilities for cleaning up areas of the hotel where construction work was done before signing the:
(Multiple Choice)
4.9/5
(32)
Which of the following places the four phases of the design process in the proper order (from phase 1 to phase 4)?
(Multiple Choice)
4.8/5
(28)