Exam 22: Activity-Based Systems-Abm and Lean

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

How does pull-through production help minimize inventories in a just-in-time operating environment?

Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
Verified

B

A just-in-time operation would attempt to eliminate inspection time.

Free
(True/False)
4.7/5
(32)
Correct Answer:
Verified

True

A nonvalue-adding activity is one that increases the cost of a product but does not add to the product's market value.

Free
(True/False)
4.9/5
(37)
Correct Answer:
Verified

True

In a just-in-time manufacturing environment, a flexible work cell is created by

(Multiple Choice)
4.9/5
(35)

In the JIT environment, direct materials and conversion costs should be nearly uniform for each product in a work cell.

(True/False)
4.8/5
(27)

In a just-in-time operating environment, the key measure of cost incurred is

(Multiple Choice)
4.8/5
(35)

Which of the following activities would be part of the supply chain of a manufacturer?

(Multiple Choice)
4.8/5
(40)

Which of the following activities would be part of the value chain of a manufacturer?

(Multiple Choice)
4.9/5
(41)

A goal of process value analysis (PVA) is to reduce nonvalue-adding activities. Outline a procedure a company could use to accomplish this goal.

(Essay)
4.8/5
(40)

Typically, there are seven levels in the cost hierarchy.

(True/False)
4.8/5
(39)

In a just-in-time environment, managing the production process focuses on

(Multiple Choice)
4.8/5
(39)

Which of the following is not a concern when managing inventory in a just-in-time environment?

(Multiple Choice)
4.8/5
(34)

President/CEO to her Controller: "On the golf course yesterday I overheard John Jeffers, the CEO for Octal, say that the problem with many manufacturing companies today is their antiquated manufacturing cost accounting systems. It appears to me that our cost accounting system has served us well as our company has grown and should continue to serve us well as we move into JIT production with our new flexible manufacturing system." As the Controller, respond to the President/CEO.

(Essay)
4.8/5
(30)

The actual amount of time that a product is being worked on is known as the

(Multiple Choice)
4.9/5
(36)

Engineering design for mass-produced automobiles is classified as a(n) __________-level activity in an activity-based costing system.

(Multiple Choice)
4.9/5
(32)

One element of a just-in-time operating environment is pull-through production, which means that a firm starts production of a product only after an order is received.

(True/False)
4.8/5
(38)

Hugley Corp. recently installed three just-in-time work areas in its blank key-making division. The work areas will make large quantities of identical key blanks for door lock manufacturers. Select the best answer for how Hugley should run its business and account for product costs.

(Multiple Choice)
4.9/5
(32)

A company's value chain includes the value chains of its suppliers but not its customers.

(True/False)
4.7/5
(28)

Which of the following statements about a just-in-time operating environment is true?

(Multiple Choice)
4.8/5
(32)

Distinguish between push-through and pull-through production methods. How does pull-through production meet the requirements of a just-in-time operating environment?

(Essay)
4.9/5
(34)
Showing 1 - 20 of 152
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)