Instruction 18-5 The maker of a packaged candy wants to evaluate the quality of her production process.On each of 16 consecutive days,she samples 600 bags of candy and determines the number in each day's sample that she considers to be of poor quality.The data that she developed follow. Number Proportion Day Poor Poor 1 33 0.0550000 2 29 0.0483333 3 31 0.0516667 4 32 0.0533333 5 43 0.0716667 6 45 0.0750000 7 46 0.0766667 8 48 0.0800000 9 48 0.0800000 10 46 0.0766667 11 28 0.0466667 12 32 0.0533333 13 28 0.0466667 14 32 0.0533333 15 31 0.0516667 16 24 0.0400000 -Referring to Instruction 18-5,a p control chart is to be constructed for these data.The estimate of the standard error of the sample proportion is ________.

(Short Answer)
4.8/5
(28)

Maintaining the gains that have been made with a revised process in the long term by avoiding potential problems that can occur when a process is changed involves which part of the DMAIC process?

(Multiple Choice)
4.8/5
(38)

Instruction 18-14 Recently,a university switched to a new type of computer-based registration.The registrar is concerned with the amount of time students are spending on the computer registering under the new system.She decides to randomly select eight students on each of the 12 days of the registration and determine the time each spends on the computer registering.The range,mean,and standard deviation of the times required to register are in the table that follows. Day Range Mean Std.Dev. 1 10 5.250 3.4949 2 31 15.250 10.3060 3 13 20.375 4.9262 4 21 22875 8.3911 5 35 8.500 11.3767 6 18 7.875 6.9372 7 25 11.250 8.5815 8 30 7.875 9.5235 9 17 10.250 6.3640 10 22 9.500 7.8740 11 27 7.875 8.7086 12 26 12875 9.3723 -Referring to Instruction 18-14,the chart is to be used for the time required to register.The lower control limit for this data set is ________,while the upper control limit is ________.

(Short Answer)
4.7/5
(37)

Instruction 18-11 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process.She takes a sample size of five from each day's output and counts the number of blemishes on each silicone sheet.The results from 20 days of such evaluations are presented below.She also decides that the upper specification limit is 10 blemishes. Day 1 2 3 4 5 Mean Range 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 -Referring to Instruction 18-11,based on the R chart,it appears that the process is out of control.

(True/False)
4.8/5
(47)

An in-control process must be achieved before being able to estimate process capability.

(True/False)
4.8/5
(32)

Instruction 18-15 The manufacturer of canned food constructed control charts and analysed several quality characteristics.One characteristic of interest is the weight of the filled cans.The lower specification limit for weight is 2.95 kilograms.The table below provides the range and mean of the weights of five cans tested every 15 minutes during a day's production. Number XBar Range Number XBar Range 1 3.05072 0.0215 16 3.04646 0.073 2 3.01228 0.087 17 3.03868 0.0696 3 3.03558 0.0851 18 3.03338 0.0329 4 3.01014 0.0674 19 3.03322 0.0455 5 3.00858 0.0983 20 3.05078 0.0215 6 3.02704 0.0527 21 3.04808 0.0396 7 3.04268 0.0508 22 3.05348 0.0581 3 3.01052 0.0791 23 3.05516 0.0682 9 3.03464 0.0663 24 3.03426 0.0325 10 3.02034 0.0538 25 3.0516 0.0641 11 3.03764 0.0584 26 3.05562 0.0809 12 3.0409 0.0434 27 3.04402 0.0374 13 3.0519 0.0762 28 3.06458 0.0284 14 3.03994 0.0833 29 3.0544 0.0738 15 3.03788 0.0601 -Referring to Instruction 18-15,an R chart is to be constructed for the weight.The upper control limit for this data set is ________.

(Short Answer)
4.8/5
(32)

In Australia,control limits on a control chart are placed so that they are three standard deviations above and below a central line.

(True/False)
4.8/5
(26)

The principal focus of the control chart is the attempt to separate special or assignable causes of variation from common causes of variation.What cause of variation can be reduced only by changing the system?

(Multiple Choice)
5.0/5
(33)

Instruction 18-15 The manufacturer of canned food constructed control charts and analysed several quality characteristics.One characteristic of interest is the weight of the filled cans.The lower specification limit for weight is 2.95 kilograms.The table below provides the range and mean of the weights of five cans tested every 15 minutes during a day's production. Number XBar Range Number XBar Range 1 3.05072 0.0215 16 3.04646 0.073 2 3.01228 0.087 17 3.03868 0.0696 3 3.03558 0.0851 18 3.03338 0.0329 4 3.01014 0.0674 19 3.03322 0.0455 5 3.00858 0.0983 20 3.05078 0.0215 6 3.02704 0.0527 21 3.04808 0.0396 7 3.04268 0.0508 22 3.05348 0.0581 3 3.01052 0.0791 23 3.05516 0.0682 9 3.03464 0.0663 24 3.03426 0.0325 10 3.02034 0.0538 25 3.0516 0.0641 11 3.03764 0.0584 26 3.05562 0.0809 12 3.0409 0.0434 27 3.04402 0.0374 13 3.0519 0.0762 28 3.06458 0.0284 14 3.03994 0.0833 29 3.0544 0.0738 15 3.03788 0.0601 -Referring to Instruction 18-15,an R chart is to be constructed for the weight.One way to create the lower control limit involves multiplying the mean of the sample ranges by D3.For this data set,the value of D3 is ________.

(Short Answer)
4.9/5
(36)

Which of the following is NOT part of the Shewhart-Deming cycle?

(Multiple Choice)
4.9/5
(38)

The CPL and CPU indices are used to measure a process' actual performance rather than its potential.

(True/False)
4.9/5
(42)

Instruction 18-16A Recently,a university switched to a new type of computer-based registration.The registrar is concerned with the amount of time students are spending on the computer registering under the new system.She decides to randomly select eight students on each of the 12 days of the registration and determine the time each spends on the computer registering.The range,mean,and standard deviation of the times required to register are in the table that follows. Day Range Mean Std.Dev. 1 10 5.250 3.4949 2 31 15.250 10.3060 3 13 20.375 4.9262 4 21 22875 8.3911 5 35 8.500 11.3767 6 18 7.875 6.9372 7 25 11.250 8.5815 8 30 7.875 9.5235 9 17 10.250 6.3640 10 22 9.500 7.8740 11 27 7.875 8.7086 12 26 12875 9.3723 -Referring to Instruction 18-16A,construct the chart for the time required to register.

(Essay)
4.8/5
(40)

Instruction 18-10 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds)is too erratic and adversely affects expected profits.The supervisor proceeds by randomly sampling five individuals per hour for a period of 10 hours.The sample mean and range for each hour are listed below. She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds,respectively. Hour 1 2 3 4 5 6 7 8 9 10 R 18.4 25 16.9 27 23.0 30 21.2 23 21.0 24 24.0 25 19.3 12 15.8 14 20.0 13 23.0 11 -Referring to Instruction 18-10,suppose the supervisor constructs an R chart to see if the variability in collection times is in control.This R chart is characterised by which of the following?

(Multiple Choice)
5.0/5
(32)

Instruction 18-16 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process.She takes a sample size of five from each day's output and counts the number of blemishes on each silicone sheet.The results from 20 days of such evaluations are presented below.She also decides that the upper specification limit is 10 blemishes. -Referring to Instruction 18-16,construct an R chart for the number of blemishes.

(Essay)
5.0/5
(41)

Instruction 18-9 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic.Accordingly,the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day. -Referring to Instruction 18-9,suppose the analyst constructs an R chart to see if the variability in production times is in control.What is the upper control limit for this R chart?

(Multiple Choice)
4.9/5
(45)

Instruction 18-17A A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds)is too erratic and adversely affects expected profits.The supervisor proceeds by randomly sampling five individuals per hour for a period of 10 hours.The sample mean and range for each hour are listed below. She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds,respectively. -Referring to Instruction 18-17A,what is the value of the Cp index?

(Short Answer)
4.8/5
(30)

Instruction 18-4 A manufacturer of computer disks took samples of 240 disks on 15 consecutive days.The number of disks with bad sectors was determined for each of these samples.The results are in the table that follows. Day Bad \% Bad 1 9 0.037500 2 7 0.029167 3 4 0.016667 4 6 0.025000 5 8 0.033333 6 3 0.012500 7 6 0.025000 8 10 0.041667 9 16 0.066667 10 24 0.100000 11 15 0.062500 12 9 0.037500 13 4 0.016667 14 8 0.033333 15 6 0.025000 -Referring to Instruction 18-4,a p control chart is to be made for these data.The upper control limit is ________,and the lower control limit is ________.

(Short Answer)
4.8/5
(30)

Instruction 18-2 A local newspaper has 10 delivery boys who each deliver the morning paper to 50 customers every day.The owner decides to record the number of papers delivered on time for a 10-day period and construct a p chart to see whether the percentage is too erratic. Number of Papers Day Delivered on Time 1 46 2 45 3 46 4 45 5 43 6 48 7 46 8 49 9 48 10 47 -Referring to Instruction 18-2,what is the numerical value of the lower control limit for the p chart?

(Multiple Choice)
4.8/5
(30)

The purpose of a control chart is to eliminate common cause variation.

(True/False)
4.8/5
(32)

Instruction 18-2 A local newspaper has 10 delivery boys who each deliver the morning paper to 50 customers every day.The owner decides to record the number of papers delivered on time for a 10-day period and construct a p chart to see whether the percentage is too erratic. Number of Papers Day Delivered on Time 1 46 2 45 3 46 4 45 5 43 6 48 7 46 8 49 9 48 10 47 -Referring to Instruction 18-2,what is the numerical value of the centre line for the p chart?

(Multiple Choice)
4.9/5
(37)