Exam 7: The Conversion Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Transaction authorization occurs in a traditional manufacturing environment in all of the following ways except

(Multiple Choice)
4.8/5
(36)

Move tickets authorize the storekeeper to release materials to work centers.

(True/False)
5.0/5
(39)

What is the difference between a materials requisition and a purchase requisition?

(Essay)
4.7/5
(32)

What is meant by the term "product family" and what is its relationship to value stream accounting.

(Essay)
4.8/5
(40)

Firms hold safety stock to compensate for

(Multiple Choice)
4.8/5
(41)

A company's value stream map depicts only the value added activities needed to complete a process or product.

(True/False)
4.7/5
(42)

Cement and petrochemicals are produced by the batch manufacturing method.

(True/False)
4.8/5
(25)

Discuss the purpose and key features of a value stream map (VSM).

(Essay)
4.8/5
(38)

The work-in-process file is the subsidiary ledger for the work-in-process control account.

(True/False)
4.9/5
(33)

Pull processing involves pulling products from the consumer end (demand), rather than pushing them from the production end (supply).

(True/False)
4.7/5
(42)

Characteristics of lean manufacturing include all of the following except

(Multiple Choice)
4.8/5
(36)

Explain how CAD can contribute to a firm's move toward world-class status.

(Essay)
4.8/5
(39)

What document signals the completion of the production process?

(Essay)
4.9/5
(30)

Reports generated by the cost accounting system include performance reports and budget reports.

(True/False)
4.8/5
(34)

Discuss the documents used in a batch processing system.

(Essay)
4.8/5
(38)

What information is contained in the bill of materials (BOM)?

(Essay)
4.7/5
(38)

Name five documents associated with batch production systems.

(Essay)
4.9/5
(36)

Accounting in a world-class manufacturing environment emphasizes standard cost and variance analysis.

(True/False)
4.8/5
(34)

The production schedule is

(Multiple Choice)
4.8/5
(38)

What document triggers the beginning of the cost accounting process for a given production run?

(Essay)
4.9/5
(36)
Showing 61 - 80 of 102
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)