Multiple Choice
Input/Output (I/O) control is used to:
A) increase work flows and queues at a work centre.
B) ensure overloading of a work centre to maximize efficiency.
C) minimize WIP at a work centre
D) manage work flows and queues at a work centre.
E) maximize make-span.
Correct Answer:

Verified
Correct Answer:
Verified
Q58: Makespan is the total time needed to
Q81: Given the following data for jobs awaiting
Q82: Given the following data for jobs awaiting
Q83: Sequencing is concerned with the order in
Q84: A schedule/control Gantt chart can be used
Q86: The output of the system is limited
Q87: All priority or dispatching rules involve complex
Q88: Shift scheduling for services does not involve:<br>A)forecasting
Q89: Jack,the owner of Jack's Electronic Repair,currently has
Q90: The owner/operator of the local franchise of