Which of the following are accurate statements concerning MPS,MRP and capacity requirements planning (CRP) ? I) CRP is equivalent to a master production schedule (MPS) .
II) CRP is needed to determine if an MPS is feasible.
III) CRP is an input to MRP.
IV) Planned-order releases from MRP are the inputs for CRP.
A) CRP is equivalent to a master production schedule (MPS) .
B) CRP is an input to MRP.
C) CRP is needed to determine if an MPS is feasible
D) Planned-order releases from CRP are the inputs for MRP
Correct Answer:

Verified
Correct Answer:
Verified
Q52: MRP requires information on inventory on hand,open
Q53: Typically the total cost of ownership (TCO)of
Q54: MRP II is simply a label for
Q55: In MRP,"scheduled receipts" are:<br>A)identical to "planned-order receipts."<br>B)identical
Q56: Lumpy demand for components required for finished
Q58: The part-period method for lot sizing breaks
Q59: One of the primary reports of MRP
Q60: Great Product,Ltd.has just received an order for
Q61: A net-change MRP is one that involves
Q62: Load reports compare planned capacity requirements with