Multiple Choice
Takt time is
A) the total work time available divided by units required by the consumer
B) the units required divided by workers required
C) a fictional time increment similar to a therblig
D) the same thing as cycle time in a process layout
E) an important consideration in balancing an assembly line
Correct Answer:

Verified
Correct Answer:
Verified
Q37: A hospital's layout most closely resembles which
Q39: The main issue in designing process layouts
Q40: Cyclone Appliances has developed a new
Q42: _ is that element of balancing a
Q43: McDonald's "Made for You" kitchen system represents
Q44: The _ is a non-numeric method for
Q45: You have been asked to balance
Q46: An electronics manufacturer makes remote control
Q81: Identify the seven fundamental layout strategies. Describe
Q313: A fabrication line and an assembly line